Summary of Contents for Schubert Prime Cube Prime Box Performance PBI1000ED 112 00
Page 1
6902168 | V 1.02 US-English translation of the original German Operating instructions This operating manual is part of the technical documentation. It provides technicians and system managers with the necessary information on: • Installation • Installation and commissioning • Operation • Maintenance www.schubert-system-elektronik.de...
Page 2
To be observed in general To be observed in general Safety instructions This document contains instructions that you must follow for your personal safety and to prevent damage to property. The instructions are marked by a warning triangle and are graded according to the degree of risk. Symbol with signal word: DANGER Imminent danger to life and health of persons.
Page 3
Products from Schubert System Elektronik GmbH comply with the relevant harmonized European standards (EN) for the respective area of application. Warranty The agreements stipulated in the General Terms and Conditions of Business (GTC) apply to Schubert System Elektronik GmbH equipment. Installation conditions The installation conditions and safety instructions specified in this document must be observed during the commission- ing and ongoing operation of the products.
Page 4
To be observed in general EU Declaration of Conformity The product from Schubert System Elektronik GmbH complies with the directives listed in the “Technische Daten” chapter. The requirements are assessed on the basis of the standards listed therein. The EU Declaration of Conformity and the associated documentation are provided in accordance with the directives at:...
Table of contents Table of contents Characteristic ............................... 1 Overview ................................. 1 Areas of application ..............................1 Block diagram ................................ 2 Installation ................................3 Unpacking and checking delivery contents ......................3 Storage and transport ............................3 Installation ................................3 Temperature ................................3 Ventilation ................................
Page 6
Table of figures Table of figures Fig. 1-1: Device view ..............................1 Fig. 1-2: Block diagram ..............................2 Fig. 2-1: Ventilation ................................. 4 Fig. 2-2: Installation position ............................5 Fig. 3-1: Opening the housing ............................8 Fig. 3-2: Connecting the 24 V DC supply voltage ......................9 Fig.
Characteristic Characteristic Overview The Prime Box Performance PBI1000ED is designed to be used as an industrial box PC for demanding tasks with high connectivity and is suitable for vertical wall mounting. Protection class: IP20 compliant with DIN EN60529 (not evaluated by UL) ...
Installation Installation Unpacking and checking delivery contents Check packaging for transport damage. – – Carefully remove the packaging to avoid causing damage. Keep the original packaging for future transport. Keep the documents supplied. – Check the contents of the packaging for visible transport damage. Check the contents for completeness on the basis of the delivery bill.
Installation Ventilation Cooling concept • The processor is cooled purely passively via free convection, i.e. neither CPU nor system fans are used. • The CPU as well as all power semiconductors of the power supply are connected to the heat sink of the com- puter housing via heatspreader and heatpipes.
Installation Installation position and mounting The Prime Box Performance PC is designed for vertical wall mounting. Pay attention to the correct orientation during installation; do not install the device upside down - see illustration below. The device is mounted by means of 2 mounting plates on the rear of the housing in vertical position. ...
Connection, commissioning and operation Connection, commissioning and operation Establishing operational readiness Interference-free connections for trouble-free operation When connecting peripheral devices, use shielded bus and LAN cables with shielded connectors to meet EMC requirements. If possible, screw or lock the plug connections as this will improve electrical shielding Signal lines must not be routed in the same cable duct as power lines.
Never operate the Prime Box Performance with the housing open. – Preconditions The devices from Schubert System Elektronik GmbH feature peripheral interfaces that can be used to connect various components. When using commercially available peripheral devices (e.g. at the USB port), please note that their EMC interference immunity is often designed for office use.
Connection, commissioning and operation Opening and closing the device again Damage to the device. To avoid damage to the device, perform the following before opening it: – Shut down the operating system. Disconnect the power supply. – Risk of burns from hot surfaces Heat sinks and heat pipes on the inside can still be very hot even after the device has been turned off: –...
Connection, commissioning and operation Connecting the power supply Supply voltage 24 V DC Electric shock if unsuitable power supply is used. Connect the device only to a power supply that meets the requirements for safe ex- tra-low voltage (SELV/PELV) according to EN/UL 61010-2-201. Connect the device only to a power supply that meets the requirements for an ener- gy-limited circuit according to EN/UL 61010-2-201, chapter 9.4 or to a circuit that meets the requirements of NEC Class 2 according to UL 1310.
Connection, commissioning and operation Connecting peripheral devices 3.5.1 Interfaces Access to connections and drives Connections to the peripherals are located on the front of the housing (see chapter “4 Technical data” on page 16). May include optional equipment! Fig. 3-3: Connections The connections are marked on the front cover.
CFast memory card Fig. 3-4: Replacing CFast memory cards 3.6.3 Operating system As ordered, Schubert System Elektronik GmbH installs the operating system specified in chapter “4 Technical data” on page 16. License notice: The pre-installed operating system is software in the Microsoft Embedded license model.
Connection, commissioning and operation 3.6.5 Information on Microsoft Windows software By default, the system starts with the existing Windows administrator user without password. We recommend creating a new local user or a user belonging to the administrator group and deactivating the ...
Connection, commissioning and operation 3.6.6 Replacing the buffer battery Fire and explosion hazard of the battery. The battery may explode if not handled according to instructions! Do not recharge, disassemble or dispose of in fire! The lithium battery may only be replaced by a type approved by the manufacturer. ...
Connection, commissioning and operation Installing the buffer battery Insert the new buffer battery into the socket with “+” facing upwards. To do this, first insert the buffer battery on the side opposite the clamp under the holders. Then press the buffer battery down until the clamp fixes the buffer battery in the socket. May include optional equipment! Fig.
Connection, commissioning and operation Disposal Dispose of the product in accordance with the applicable national regulations. The device is dismounted and completely disassembled: Metal and plastic parts can be recycled accordingly. Electronic components must be disposed of in accordance with the national regulation. ...
Technical data Technical data General Component Description Housing Prime Box Mechanically stable aluminum housing for vertical installation in the control cabinet Passive cooling Industrial, EMC-compliant housing design Dimensions including heat sink and holder (WxHxD): 132 mm x 356 mm x 217.25 mm Weight: 6.25 kg Protection class IP20 compliant with DIN EN60529 (not evaluated by UL)
Technical data Mechanical dimensions 4.2.1 Device dimensions Prime Box Performance | PBI1000ED 217,25 44,46 Dimensions in mm General tolerance ISO 2768 – mK Fig. 4-1: Device dimensions Prime Box Performance Operating instructions | V 1.02...
Ground straps with ring cable lugs are not suitable. The grounding point must also have a low-impedance ground connection. Length, width and shape of the ground straps are recommendations of Schubert System Elektronik GmbH. Fig. A-2: Ground straps Grounding concept Annex | V 1.02...
Need help?
Do you have a question about the Prime Cube Prime Box Performance PBI1000ED 112 00 and is the answer not in the manual?
Questions and answers