Thank you for purchasing the Tie Down Mailbox Steel Post Kit. This post is constructed of tough 14 gauge powder coated steel.
Included with the Mailbox Kit: universal mailbox mounting plate and four 3/8" carriage bolts/nuts/washers for attachment to your
mailbox. There are three basic methods of installation: concrete, lumber post, or cold environment.
Mailbox Mounting Plate Installation
• Locate the hardware bag and layout the 4 carriage bolts,
nyloc nuts, washers, and mounting plate.
• Position the mailbox post on level ground with the
mounting holes on top.
• Slide the universal mounting plate over the post. The
4 mounting tabs will be positioned on the outside of the
post tube as shown right in Fig. 1-1.
• Working one at a time, slide a 3/8" carriage bolt in
from the outside through the mounting plate/post. The
carriage bolt should mount flush against the mounting
plate as shown in Fig. 1-2.
• Slide a washer over the carriage bolt from the inside of
the top of the bracket/post as shown in Fig 1-3 below.
• Attach a 3/8" nyloc nut over the washer/bolt, lightly
tighten but not fully tightened.
• Repeat the process for the remaining three bolts.
• Once all the bolts/washers /nuts are in place and the
mounting bracket is squarely mounted, fully tighten all
four nyloc nuts as shown in Fig 1-4.
Fig. 1-3
WARNING: This product can expose you to chemicals including Nickel, which is
known to the State of California to cause cancer. For more information go to:
www.P65Warnings.ca.gov
Mailbox Post Kit
Installation
Part ID: 33260
Accommodates T1, T2, or T3
Size Rural Mailboxes
3/8"
Carriage Bolts
Fig. 1-1
Fig. 1-2
Fig. 1-4
404-344-0000 • www.tiedown.com
605 Stonehill Drive SW, Atlanta, GA 30336
sales@tiedown.com
Universal Mounting Plate
Online
Installation
Instructions
Instruction 08451
EC2010; Rev. 2/5/23
Need help?
Do you have a question about the 33260 and is the answer not in the manual?
Questions and answers