• Ventilation openings must be kept free and must not be blocked by other equipment, furniture or objects. • Please do not put any objects on top of the unit. • In the event of a fault, only have the AEROMAT 100 repaired by experienced specialists with training and practice in the maintenance of ventilation units.
Page 5
- ensure that system is voltage-free - earthing and short-circuiting - cover or isolate proximate live parts SIEGENIA offers training courses for the acquisition of some of the required knowledge and skills. Contact your SIEGENIA sales consultant in case of requirement. H47.FENS014EN-04 12.2023...
Page 6
- The country-specific directives must be stringently observed for all work on the voltage or house installation mains. - Should a solid object or any liquid get inside the unit, stop operation immediately and disconnect the AEROMAT 100 from the electricity grid:...
3. Install the AEROMAT 100 in its intended installation position and seal it in accordance with the installation directives applicable on site. 4. Check AEROMAT 100 for cleanliness prior to starting it up. If necessary, thoroughly clean the unit as described in our operating instructions.
(e.g. VDE 0100) and any relevant country-specific requirements. › Switch off or unscrew the fuses. Important: if the AEROMAT 100 Type DK is connected directly to the 230 V AC mains power supply, a mains isolator must be installed by the customer. blue...
• The air flow into the room varies as the wind pressure changes with the weather. Unit types Depending on its version, the AEROMAT 100 is delivered with a left or right-hand operating lever. On the respective opposite side, there is a small screw for the pressure setting of the fan flap.
Assembly and operating instructions AERO AEROMAT 100 Operation AEROMAT 100 Type D 1. Open the fan flap 2. Close the fan flap AEROMAT 100 Type DK 1. Open the fan flap (operating lever opens automatically) 2. Close the fan flap (operating lever closes automatically) Öffnen...
› Switch off all poles of the mains cable. › If required, clean the outer parts of the AEROMAT 100's casing using a suitable cloth, which has been moistened with a mild soap sud or washing-up liquid. › Never use cleaning agents that are aggressive or contain solvents, as these may damage the surface of the unit.
Page 12
Assembly and operating instructions AERO AEROMAT 100 Cleaning the front panel and sealing plate 1. Close the fan flap. 2. Lift and remove lid using a flathead screwdriver 3. Lift front panel using a flathead screwdriver 4. Pull out front panel and sealing plate from behind and pull off of the operating lever 5.
3. Push the rodding against the existing profile and hold in place. The upper edge of the rodding must be flush with the top edge of the AEROMAT 100. 4. Fix the rodding with timber or self-tapping countersunk screws (provided on-site).
Assembly and operating instructions AERO AEROMAT 100 Technical specifications Data table Specifications for AEROMAT 100 Type D/Type DK Sound absorption (R 42 dB 39 dB w1.9 Sound absorption in accordance with DIN EN ISO 20140- 49 dB 46 dB 10 (D n,e,w Air throughput (approx.)
Need help?
Do you have a question about the AEROMAT 100 and is the answer not in the manual?
Questions and answers