ALI Aladdin Temp-Rite DR88ET Installation, Operation & Service Manual

Dome storage racks

Advertisement

P.O. Box 2978, Hendersonville, TN 37077-2978
1-800-888-8018 or 615-537-3600
Fax 1-888-812-9956
www.aladdintemprite.com
DOME STORAGE RACKS
DR108S
Allure Soup Dome Storage rack
Manual P/N 93488
Rev. F 5/19/2015
Allure Dome Storage rack
INSTALLATION, OPERATION & SERVICE MANuAL
DR160E
®
DR88ET
DR108S
DR112ES
DR160E
DRXLR
DRXLR
Temp-Rite II excel & Ready Chill
Storage rack

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Aladdin Temp-Rite DR88ET and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for ALI Aladdin Temp-Rite DR88ET

  • Page 1 ® P.O. Box 2978, Hendersonville, TN 37077-2978 1-800-888-8018 or 615-537-3600 Fax 1-888-812-9956 www.aladdintemprite.com DOME STORAGE RACKS DR88ET DR108S DR112ES DR160E DRXLR DR108S Allure Soup Dome Storage rack DR160E Allure Dome Storage rack DRXLR Temp-Rite II excel & Ready Chill Storage rack Manual P/N 93488 INSTALLATION, OPERATION &...
  • Page 2 ® Copyright © 1999 Aladdin Temp-Rite Changes may be made to the information in this document without notification.
  • Page 3: Table Of Contents

    DOME STORAGE RACKS Installation, Operation & Service Manual CONTENTS I. SPECIFICATIONS 4 II. RECEIVING INSPECTIONS III. INSTALLATION 6 IV. CLEANING / MAINTENANCE 6 V. PARTS LIST 7 VI . WARRANTy & LIAbILITy FOR PARTS & SERVICE CALL 1 (800) 888-5426...
  • Page 4: Specifications

    DOME STORAGE RACKS Installation, Operation & Service Manual I. SPECIFICATIONS Model Number DR160E DRXLR DR88ET DR108S DS112ES 9” Allure HOD On Tray Essence Temp-Rite II ● ● ● 9” ● dome dome dome Excel domes Allure Soup ● Products Ready- dome 9”...
  • Page 5: Receiving Inspections

    II. RECEIVING INSPECTIONS Your Aladdin Drying Rack is factory tested for performance and is free from defects when shipped. The utmost care has been taken in packaging this product to protect against damage in transit. You should carefully inspect your Drying Rack to assure that no damage has occurred in transit. If however, damage is detected see the following damaged goods policy.
  • Page 6: Installation

    DOME STORAGE RACKS Installation, Operation & Service Manual III. INSTALLATION  Inspect exterior of box for damage. If any, see Section II Receiving inspection. Remove top of box from pallet Remove dome rack from pallet  Inspect dome rack for damage. If any, see Section II Receiving inspection. ...
  • Page 7: Parts List

    PARTS LIST Sales Code Part Number Description Y104S 93397 Frame assembly (cap, frame, & casters) 93464 5” stem swivel caster 99841 5” stem swivel caster with brake 99839 Tube cap 75081 9” Allure Entree, 9” insulated base dome wire rack J88E 75060 TRII Excel / Ready-Chill dome wire rack...
  • Page 8: Warranty & Liability

    DOME STORAGE RACKS Installation, Operation & Service Manual VI . WARRANTy & LIAbILITy ALADDIN TEMP-RITE ® EQuIPMENT LIMITED WARRANTY Aladdin Temp-Rite (“ATR”) warrants to the original purchaser that the equipment listed below shall be free from ® defects in material and workmanship under normal use for the applicable warranty term set forth below. ATR’s obligation under this warranty is limited to the repair or replacement, at the sole option of ATR, of any part which upon inspection and examination by ATR or its authorized agent is found to be defective.

This manual is also suitable for:

Aladdin temp-rite dr108sAladdin temp-rite dr112esAladdin temp-rite dr160eAladdin temp-rite drxlr

Table of Contents