Spark Marathon
2 Requirements
Clarity Installation with AS Control module (p/n A26).
l
Free serial COM port in the PC
l
Note:
Modern computers usually have only 1 (if any) serial (COM) port installed. To use
more devices requiring the port, the MultiCOM adapter (p/n MC01) is available.
Serial cross DB9F-DB25M cable (p/n SK03).
l
Note:
Cables are not part of Clarity Control Module. It is strongly recommended to order
required cables together with the Control Module.
- 2 -
2 Requirements