Download Print this page

Sanipex BAGNODESIGN BDD-REV-535 Series Installation Manual

Revolution slide rail with integrated wall inlet

Advertisement

Quick Links

BDD-REV-535-XX
REVOLUTION SLIDE RAIL WITH INTEGRATED WALL INLET
www.sanipexgroup.com

Advertisement

loading

Summary of Contents for Sanipex BAGNODESIGN BDD-REV-535 Series

  • Page 1 BDD-REV-535-XX REVOLUTION SLIDE RAIL WITH INTEGRATED WALL INLET www.sanipexgroup.com...
  • Page 3: Important Please Read

    IMPORTANT PLEASE READ All products manufactured and supplied by BAGNODESIGN are fit for purpose as long as they are Installed, used correctly, cleaned and receive regular maintenance in accordance with these instructions ... Remove all packaging and check the product for damage or missing parts before commencing with the installation.
  • Page 4: Box Contents

    Box Contents Select a convenient height to place the shower rail based on your personal needs. Mark the place for drilling the hole in wall. Slide Rail  Allen key  Anchor  Screw  Wall Flange  Inlet Connecter Remove the lateral brackets from the slide rail by using allen key.
  • Page 5 Install hand shower by using thread tape. Installation Complete...
  • Page 6 Note:...
  • Page 7 Note:...
  • Page 8 www.sanipexgroup.com IND-REV-535-XX-01-23...

This manual is also suitable for:

Bagnodesign bdd-rev-535-cp