Sanipex BAGNODESIGN BDD-ZEP-560 Series Installation Manual

Sanipex BAGNODESIGN BDD-ZEP-560 Series Installation Manual

Advertisement

BDD-ZEP-560-XX
ZEPHYR BODY JET 48X48MM
www.sanipexgroup.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BAGNODESIGN BDD-ZEP-560 Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Sanipex BAGNODESIGN BDD-ZEP-560 Series

  • Page 1 BDD-ZEP-560-XX ZEPHYR BODY JET 48X48MM www.sanipexgroup.com...
  • Page 3 IMPORTANT PLEASE READ All products manufactured and supplied by BAGNODESIGN are fit for purpose as long as they are Installed, used correctly, cleaned and receive regular maintenance in accordance with these instructions ... Remove all packaging and check the product for damage or missing parts before commencing with the installation.
  • Page 4 Installation Steps For Walls Fixing Make sure that the connections Clean carefully the pipes and are ready for bodyjet. check the water flow before connecting the bodyjet to the system to ensure a good operation. Fix the bolt into the wall outlet Remove the backside bolt used by a suitable Allen key.
  • Page 5 Clean the connection and fix the Installation complete. body-jet followed by the back plate. All surface should be cleaned using a clean damp cloth. No abrasive Cleaning cleaning agents or materials should be used.
  • Page 6 Installation Steps for PVC, Cement Board Walls etc. Fix the back nut followed by Clean the connection from both rubber washer to the bolt on sides of the wall and push body-jet into the outlet connection the back side of the board carefully.
  • Page 7 Note:...
  • Page 8 www.sanipexgroup.com IND-ZEP-560-XX-02-22...

Table of Contents