Hydraulic diagrams and wiring diagrams..............21 Commissioning......................23 Set up WLAN - during commissioning..................28 Configuration..........................28 Operation basics...................... 30 Licenses............................30 Data protection declaration of Ulrich Brunner GmbH..............31 Display views..........................31 Home view overview........................33 Displays and setting options under Settings................34 6.5.1 Control panel and system.....................34 6.5.2...
Ulrich Brunner GmbH reserves the right to make technical changes insofar as they serve technical progress or are required by safety regulations. Storage of the documents These instructions for Extension board 'Basic' (EWP Basis) are kept by the operator of Extension board 'Ba- sic' (EWP Basis) after use for future reference. IMPORTANT...
For your safety Dangers and safety measures The assembly, installation, maintenance and servicing of Extension board 'Basic' (EWP Basis) may only be carried out by a specialist company. • Only carry out activities that are described in these instructions. Electric shock Work on the electrical installation may only be carried out by a qualified specialist company.
→ Result or safe use Regulations Approval For the installation of Extension board 'Basic' (EWP Basis), please observe the technical data of the existing power supply. Notes and requirements for energy systems (§ 16): 1) Energy systems must be installed and operated in such a way that technical safety is guaranteed. Subject to other legal regulations, the generally recognized rules of technology must be observed.
Page 9
Operation of electrical installations - DIN VDE 0165, Installation of electrical installations in potentially explo- sive atmospheres - DIN VDE 0701, Repair, modification and testing of electrical equipment. When installing, commissioning and maintaining Extension board 'Basic' (EWP Basis), please observe the following regulations and guidelines, among others: Legal requirements •...
Product description Intended use The Extension board 'Basic' (EWP Basis) can only be used in conjunction with other BRUNNER units. For example, with BRUNNER log boilers (Scheitini, Scheitikus or Scheitikum), BRUNNER pellet boilers (Pelletini, Pelletikum, Pelletikus) or the electronic stove control (EOS).
EOS (electronic stove control). All BRUNNER natural energy boilers and stoves can be operated with or without solar sys- tems, oil or gas boilers. The heat consumers can include Radiators, convectors, wall heating, underfloor heating.
Illustration 1: Enclosure dimensions Installation without surface-mounted box The Extension board 'Basic' (EWP Basis) can also be ordered without a surface-mounted box. In this case, the type plate is located on the delivery box. Remove the type plate from the packaging and keep it with the documentation for Extension board 'Basic' (EWP Basis).
4. the cover of the housing is fastened with plastic screws in the positions marked with blue arrows (2). → The Extension board 'Basic' (EWP Basis) is now fully assembled. Electrical connections DANGER Mains voltage - electric shock There is a risk of fatal electric shock on contact with the mains voltage.
System configuration on another display - User interface is locked. Introduction When the Extension board 'Basic' (EWP Basis) is switched on or supplied with mains voltage for the first time, a commissioning wizard starts automatically and actively guides you through the commissioning process.
Page 25
At this point, the installer can see whether all the control boards he has installed are communicating with each other. All control and regulation boards that have been detected in the BRUNNER network environ- ment are listed. Check the list for completeness.
Page 27
(under Set- tings / Configuration). See chapter “Configuration”. Phase 8: Enter tradesman data End of commissioning and configuration of Exten- sion board 'Basic' (EWP Basis). Tap End to confirm. A short beep sounds and the display changes to the Home view.
Set up WLAN - during commissioning Commissioning is user-defined. This initial process includes the entire BRUNNER network environment and all control boards of the connected devices. Automatically starting commissioning 1. Initialization 2. Set language 3. Check BRUNNER network connections 4. Set time and date 5.
Ulrich Brunner GmbH Notes on protecting your personal data Ulrich Brunner GmbH always endeavors to save and process only the personal data that are necessary and indispensable or that are required to be stored and processed by law. We strictly adhere to the requirements of the General Data Protection Regulation (GDPR) and the Federal Data Protection Act (BDSG and BDSG new).
Page 32
Illustration 3: EWP basis with tiled stove Illustration 4: Home view with EWP Basis with + EOS and auxiliary heating 1 (oil boiler) Brunner log boiler, without auxiliary heating Illustration 5: EWP basis with Brunner log boiler and auxiliary heating 1 (oil boiler) Operating instructions EWP Basis (2.33)
= online with mybrunner Button for the home view of the BRUNNER boiler, the entire boiler control system Button for the home view of the heating system; the entire control of the heat consumers and heat gener- ators;...
Pellets / logs / pellet module (heat generator parameter) This button has different names depending on the configured heat generator: Pellets = BRUNNER pellet boil- er; Logs = BRUNNER log boiler; Pellet module = BRUNNER pellet module with control via an EOS (electron- ic stove control).
6.5.3 Heating circuit 1 and 2 These parameters are valid for both heating circuits of the EWP Basis: heating circuit 1 and heating circuit 2. Designation M.E. Explanations...
Information and error messages Based on the highest industry standards, all BRUNNER expansion boards have a detailed safety concept. The controller not only regulates and monitors the current operating status, but also independently and continuously checks the function of all connected sensors, motors and mixers.
List of error codes The following is a list of error codes that can appear at Extension board 'Basic' (EWP Basis) and are shown on the display: Error text Error text Description Note to the specialist Temperature sensor B-E06 Heating circuit 1 is defective or not connected.
- Maintenance and service work - Troubleshooting The Extension board 'Basic' (EWP Basis) should be cleaned annually on the outside of the surface-mounted box. Wiping off the dust with a cloth is sufficient. Caution ! Too much moisture can damage the device.
Disposal may only be carried out by trained and authorized personnel. Observe all local and country-specific safety precautions regarding work on the electronics. To decommission the Extension board 'Basic' (EWP Basis), proceed as follows: 1. Disconnect the power supply; 2. Disconnect all connections;...