Installation Instructions READ ALL INSTRUCTIONS BEFORE UNPACKING THE PRODUCT Important 1- For best results, we recommend that this unit be installed by a licensed, professional plumber. 2- Please read over these instructions thoroughly before beginning installation. Make sure that you have all tools and supplies needed to complete the installation.
Page 3
Valve Installation Instructions Installation Schematics – Measuring for Ideal Tub/ Shower Performance Installation of this product at non-recommended measurements may lead to issues such as water discharge from the showerhead during tub fill mode. Position the valve body 45-48 inches from the floor of the tub basin.
Page 4
Valve Installation Instructions SHUT OFF WATER SUPPLIES. Consider the type and thickness of your finished wall before placing your Finished wall stringer back plate. Flush with the finished wall Install the body so the surface of the finished wall is flush with the front of the rough-in box.
Page 5
Valve Installation Instructions Solder water supply tube to the valve body. For 1/2” Copper Tube Soldering Note: Prior to soldering remove check stops, pressure balancing cartridge and diverter cartridge. Remove check stops by loosening hex nut counterclockwise. Remove the pressure balancing cartridge and diverter cartridge by unscrewing retaining nut with an adjustable wrench.
Page 6
Valve Installation Instructions With both check stops in the fully OPEN position, turn Pressure Testing on cold and hot water supplies and conduct a system water pressure leak test. Note: To protect the valve, keep mudguards and rough-in box on during installation. Remove only when you are ready to install trims.
Page 7
Trim Installation Instructions Remove two round mud guards by turning counter- closewise and discard. Remove the rough-in box and discard. Screw small decorative tube over the diverter valve and slide large decorative tube and cartridge cover onto the pressure balancing valve. Use water to wet the round rubber gaskets on the cover plate and slide cover plate over two decorative tubes.
Page 8
Cleaning and Maintenace Instructions Remove cartridge handle, diverter handle and trim panel. Remove the decorative ring and decorative sleeve tube. Using light force only, turn 2 check stops clockwise to close the check stops with the flat head screwdriver, until you feel resistance, the check stops are in the closed position.
Page 9
Shower Head and Shower Arm Instructions SHUT OFF WATER SUPPLIES. Consider the type and the thickness of your finished wall before placing your stringer back plate. Install the threaded adapter so the surface of the Finished wall finished wall is flush with the front of the threaded adapter.
Page 10
Hand Shower Holder Instructions SHUT OFF WATER SUPPLIES. Consider the type and the thickness of your finished wall before placing your Finished wall stringer back plate. Install the threaded adapter in the wall and do not further than the face of the finished wall, the distance between threaded adapter and wall surface is maximum 9/16 inch (15mm).
This warranty is extended to the original consumer owner, but does not cover installation or any other labor charges. In no event shall KIBI be liable for any incidental, consequential or special damages, installation cost, labor, travel time, freight costs incurred, lost profits, or contingent liabilities. KIBI makes no representation that its products comply with any or all local building or plumbing codes.
Need help?
Do you have a question about the Cube KSF405 and is the answer not in the manual?
Questions and answers