16911-B STOP DO NOT RETURN TO THE STORE! If you discover missing or damaged parts, or if you have questions about the building process, please reach out to us directly for the fastest service. 24/7 Support Business Hours help.backyardproducts.com (734) 242-6900 Answers to frequently Monday - Friday ...
Page 2
$500 gift card. Write a Backyard Products, LLC. product review at backyardreviews.net for a chance to win a $500 Visa gift card. No purchase necessary to enter. Must be legal U.S. resident (including DC & Puerto Rico), 18 or older to participate. Taxes on prize are responsibility of winner. Odds of winning depend on the number...
16911-B 11-04-2022 ASSEMBLY MANUAL A Backyard Products Company GABLE 8' x 12' (244 x 366 cm) ACTUAL FLOOR SIZE IS 96 x 141" (243,2 x 358,1 cm) KEEP THIS MANUAL FOR FUTURE REFERENCE 5 Door Trim Options: Building: 8' x 12' I M PO RTANT! READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY.
Page 4
TOOLS Required Optional ❑ Phillips Tool Belt/ ❑ ❑ Utility Knife Screwdriver Nail Pouch ❑ Shingle Blades Drill / Driver ❑ 1/8" Drill Bit ❑ ❑ Tin Snips 1/4" Drill Bit ❑ ❑ Caulk Gun (for drip edge) 5/16" Drill Bit ❑ 1/2" Drill Bit ❑ ❑ ❑ Chalk Line #2 Philips Drive Bit ❑...
ADDITIONAL MATERIALS FOUNDATION OR FLOOR MATERIALS • If you purchased a separate floor kit, use instructions and materials in that kit to construct your floor.. • See the FLOOR LEVELING section on page 7 for recommended methods and suggested materials to properly level your floor, as this will vary depending on your specific site. REINFORCED WOOD FLOOR FRAME (OPTIONAL) IMPORTANT! This floor has been designed for general use. Depending on your specific use you may want to construct a heavy duty floor frame by adding additional floor joists (shown below as shaded). Below is a list of additional materials (not included): 2 x 4 x 8' (5 x 10 x 96 cm) Treated Lumber Cut to 2 x 4 x 93"...
PARTS IDENTIFICATION AND SIZES Part identification WOOD SIZE CONVERSION CHART letters are stamped on some parts. Treated lumber is stamped: Nominal Board Size Actual Size 2 x 4....1-1/2" x 3-1/2" (3,8 x 8,9 cm) 1 x 4....3/4" x 3-1/2" (1,9 x 8,9 cm) 2 x 3....1-1/2"...
Page 7
PARTS LIST continued... 19/32 x 5-1/2 x 6-13/16" (1,5 x 14 x 17,3 cm) LEFT 19/32 x 5-1/2 x 6-13/16" (1,5 x 14 x 17,3 cm) RIGHT 2 x 3 x 5-1/2" (5,1 x 7,6 x 14 cm) 3/8 x 4-3/8 x 8-1/2" (1,0 x 11,1 x 21,6 cm) 2 x 6 x 3-5/8" (5,1 x 15,2 x 9,2 cm) 2 x 6 x 5-1/4" (5,1 x 15,2 x 13,3 cm) 3/8 x 8-1/2 x 61-5/16" (1 x 21,6 x 155,7 cm) 19/32 x 3-1/2 x 66-1/4" (2,5 x 8,9 x 168,3 cm) 2 x 3 x 68-7/16" (5,1 x 7,6 x 173,2 cm) 7-1/4 x 18-1/4" (18,4 x 46,4 cm) OSB OR WOOD GRAIN 7-1/4 x 18-1/4" (18,4 x 46,4 cm) WOOD GRAIN 2 x 4 x 68-7/16" (5,1 x 10,2 x 173,2 cm) 19/32 x 2-1/2 x 22-5/8" (2,5 x 6,3 x 57,5 cm) 19/32 x 2-1/2 x 59" (2,5 x 6,3 x 149,9 cm) 19/32 x 2-1/2 x 59" (2,5 x 6,3 x 149,9 cm) 69" (175,3 cm) Door Stiffener PANEL PARTS LIST NOTE: Panel parts are not stamped. ROOF PANELS Roof panels are 7/16"...
Page 8
WALL PANELS & DOORS 3/8 x 22-1/4 x 72" 3/8 x 48 x 72" 3/8 x 19-7/8 x 72" (1 x 56,5 x 182,9 cm) (1 x 121,9 x 182,9 cm) (1 x 50,5 x 182,9 cm) LEFT DOOR RIGHT DOOR NAIL BOXES 3" (7,6 cm) BOXES 2" (5,1 cm) BOXES FASTENER/HARDWARE BAG 1-1/2" (3,8 cm) x120 NOTE:...
Page 9
FLOOR LEVELING OPTIONS There are multiple ways to level your floor frame. Our recommended leveling method is shown below. Leveling materials are not included in this kit. PREFERRED METHOD - 4x4 TREATED RUNNERS • 3" Screws angled into 4x4. • (2) at each point frame • and 4x4 touch. 12" (30,5 cm) Measurements to centers of 4x4's. MATERIAL REQUIRED 12"...
Page 10
CONCRETE FOUNDATION Your kit contains all materials to construct a wooden floor. If you choose to install your kit on a concrete slab refer to the diagram below. Treated Sill Plate Caulk between sill plate and concrete. 3-1/2" (8,9 cm) 4" (10,2 cm) Building Size Actual Size 8' x 12' (243,2 x 365,8 cm) 96" x 141" (243,2 x 358,1 cm) 141"...
FLOOR FRAME PARTS REQUIRED: Look for 3" (7,6 cm) TREATED 2 x 4 x 93" (5,1 x 10,2 x 236,2 cm) Stamp 2 x 4 x 141" (5,1 x 10,2 x 358,1 cm) BEGIN Arrange parts as shown on flat surface. Measure and mark. HINT: Secure with (2) 3" nails at each mark. For easier nailing stand on frame.
Page 12
LEVEL AND SQUARE FLOOR FRAME Before attaching floor decking, it is important to level and square the floor frame. A level and square floor frame is required to correctly construct your shed. BEGIN See page 7 for the preferred floor leveling method. Use level and check the frame is level before applying floor panels. Check for frame squareness by measuring diagonally across corners. If the measurements are the same, the frame is square. The diagonal measurement will be approximately 170-9/16" (433,2 cm). When the frame is level and square, secure one side of frame to the 4x4 runners with one fastener at ends of each runner. Move to the opposite end of the frame. Secure the frame to 4x4 runners with (1) fastener at ends of each runner making sure the frame remains square (Fig. A). FINISH Once the floor frame is level and square fasten the frame to the 4x4 runners at each point the frame contacts the 4x4 runners. First, secure at ends with Fig.
Page 13
FLOOR PANELS PARTS REQUIRED: 2" (5,1 cm) 5/8 x 48 x 96" (1,6 x 121,9 x 243,8 cm) Install panels with rough side up (painted grid lines). Ensure your floor frame is square by installing one panel and squaring frame. BEGIN Attach the 48" x 96" panel with the 48" edge and corner flush to the floor frame (Fig A). Secure panel with (2) 2"...
Page 14
FLOOR PANELS PARTS REQUIRED: x124 2" (5,1 cm) 5/8 x 48 x 96" 5/8 x 45 x 96" (1,6 x 121,9 x 243,2 cm) (1,6 x 114,3 x 243,2 cm) Continue installing panels. Install 45" panel in middle of floor frame. Use grid lines on panels to locate frame. Secure with 2" nails spaced 6" apart on edges and 12" apart inside panels. 141"...
Page 15
IMPORTANT! Check the floor frame is level after installing floor panels. Re-level if needed. • The floor should be used as a stable work surface for wall construction. • Organize your assembly procedure during the build process HINT: to avoid over-handling of the walls. Back Wall Right Wall Front Wall...
Page 16
SIDE WALL FRAME PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 46-1/2" (5,1 x 10,2 x 118,1 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) 2 x 4 x 94-1/2" (5,1 x 10,2 x 240 cm) Build two identical side walls. BEGIN HINT: Arrange parts on edge on floor. Measure and mark. For easier nailing stand on frame. Secure with (2) 3" nails at each mark and (4) 3" nails at seams. 141"...
Page 17
SIDE WALL PANELS PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE 48 x 72" (121,9 x 213,4 cm) BLOCK Ensure your wall is square by installing one panel and squaring frame. Install all panels with the primed side facing out. Install (1) 48" x 72" panel on wall frame, flush to top of frame, as shown. Use the gauge block to mark the 3/4" measurement on the wall stud.
Page 18
SIDE WALL PANELS PARTS REQUIRED: x109 2" (5,1 cm) 3/4" GAUGE BLOCK 3/8 x 22-1/4 x 72" 48 x 72" (1 x 56,5 x 182,9 cm) (121,9 x 213,4 cm) Install (1) 48" x 72" and (2) 22-1/4" x 72" panels flush to installed panels. Install the 48" x 72" panel first. Secure with 2"...
Page 19
BACK WALL FRAME PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) 2 x 4 x 89" (5,1 x 10,2 x 226,1 cm) BEGIN Arrange parts on edge on floor. Measure and mark. Secure with (2) 3" nails at each mark. 89"...
Page 20
BACK WALL PANELS PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE BLOCK 3/8 x 48 x 72" (1 x 121,9 x 182,9 cm) Install all panels with the primed side facing out. Install (2) 48" x 72" wall panels, as shown. Secure panels to frame with 2" nails spaced 6" apart along edges and 12" apart on inside of panel. BEGIN HERE 3-1/2"...
FRONT WALL PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 16-1/2" (5,1 x 10,2 x 41,9 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) 2 x 4 x 89" (5 x 10,2 x 226,1 cm) BEGIN Arrange parts on edge on floor. Measure and mark. HINT: Secure with (2) 3" nails at each mark. For easier nailing stand on frame.
Page 22
FRONT WALL PARTS REQUIRED: 3" (7,6 cm) Temporary Support 69" (175,3 cm) Door Stiffener 2" (5,1 cm) 3/8 x 19-7/8 x 72" (1 x 50,5 x 182,9 cm) Install all panels with the primed side facing out. Install 19-7/8" x 72" panels onto wall frame flush to SZ. Secure panels with 2" nails spaced 6" apart. Install OO as a brace to maintain 56"...
Page 23
FRONT WALL PARTS REQUIRED: 3" (7,6 cm) 2 x 3 x 72" (5,1 x 7,6 x 213,4 cm) Center OY on SZ flush to edge of panel (Fig. A, Fig. B). Secure with (5) 3" screws spaced evenly and screwed-in at an angle. Fig. A Flush Flush to panel edge Fig.
Page 24
RIGHT SIDE WALL INSTALLATION PARTS REQUIRED: 3" (7,6 cm) 69" (175,3 cm) Door Stiffener 3" (7,6 cm) 2" (5,1 cm) BEGIN Center 12' right side wall on the 141" (358,1 cm) floor dimension. 1" (2,5 cm) overlap is to the bottom. Install OO as a temporary brace. Secure with (2) 3" screws. 3"...
BACK WALL INSTALLATION PARTS REQUIRED 2" (5,1 cm) 3" (7,6 cm) 2" (5,1 cm) 1-1/2" (3,8 cm) 3" (7,6 cm) Fig. B BEGIN Place back wall centered on floor. Secure wall with (1) 2" screw into side wall bottom plate (Fig. A) and top plate (Fig. B). 2"...
Page 26
LEFT SIDE WALL INSTALLATION PARTS REQUIRED: 2" (5,1 cm) BEGIN Center left side wall on the 141" (358,1 cm) floor dimension. Secure wall with (1) 2" screw through back wall Fig. B panel into side wall bottom 2" (5,1 cm) and top plates (Fig. B, Fig. A). Screw Secure wall to bottom plate first. ENSURE PANEL CORNERS ARE FLUSH.
Page 27
3" (7,6 cm) Screw Fig. D Nail back wall panel to side wall stud with 1-1/2" nails spaced 6" apart. Secure gable wall top plate with (1) 3" screw angled at the corner, as shown (Fig. D). 6" (15,2 cm) 1-1/2" (3,8 cm) FINISH Nails Your left side wall is now installed.
Page 28
FRONT WALL INSTALLATION PARTS REQUIRED 2" (5,1 cm) 3" (7,6 cm) 2" (5,1 cm) 3" (7,6 cm) 1-1/2" (3,8 cm) 2" (5,1 cm) Screw Fig. B BEGIN Place front wall on floor centered between side walls. Secure wall with 2" screws into top and bottom plates (Fig. A, Fig. B). Secure wall to bottom plate first.
Page 29
RAFTERS PARTS REQUIRED: x132 3" (7,6 cm) 2" (5,1 cm) OSB OR WOOD GRAIN TEMPORARY SUPPORT 7-1/4 x 18-1/4" (18,4 x 46,4 cm) 2 x 6 x 5-1/4" (5,1 x 15,2 x 13,3 cm) 2 x 4 x 68-7/16" (5,1 x 10,2 x 173,2 cm) You will build SIX assemblies. (5) with two gussets, and (1) with one gusset. ¸ BEGIN HINT: Place AYB against back wall at measurement shown.
Page 30
RAFTER INSTALL PARTS REQUIRED: 3" (7,6 cm) (1) GUSSET Preassembled Preassembled ¸ BEGIN Secure rafters to top plate with (2) 3" screws in each rafter (Fig. A, Fig. B). Note single-gusset rafter at back wall with gusset facing inward. Measure to edge MEASUREMENTS ARE TO CENTER OF RAFTER of end rafter 22-7/8"...
Page 31
BACK GABLE UNIT PARTS REQUIRED: 1-1/2" (3,8 cm) 2 x 4 x 35-3/16" (5,1 x 10,2 x 89,4 cm) Install gable panels with the primed side facing out. BEGIN Orient RLB on flat as shown. Install left gable panel as shown. Secure with 1-1/2" nails, as shown. 1-3/4" (4,5 cm) 1-1/2" (3,8 cm) Nails RLB (on flat) 1-1/2" (3,8 cm) Place right gable panel flush to left panel. Secure with 1-1/2" nails.
Page 32
(3,8 cm) Measure and (3,8 cm) Measure and Mark Mark Fig. A 3" (7,6 cm) Screws Working inside, secure gable unit with (2) 3" screws angled into RLB at an angle (Fig. A). FINISH Your back gable unit is now installed.
Page 33
FRONT GABLE UNIT PARTS REQUIRED: 1-1/2" (3,8 cm) 2 x 4 x 21-3/4" 2 x 4 x 6-1/2" (5,1 x 10,2 x 55,2 cm) (5,1 x 10,2 x 16,5 cm) Install gable panels with the primed side facing out. BEGIN Arrange parts UY and RH on flat, as shown. Install left gable panel as shown. Secure with 1-1/2" nails as shown. 1-3/4" (4,5 cm) 1-1/2" (3,8 cm)
Page 34
(7,0 cm) Flush Flush URB x4 3" (7,6 cm) Fig. B Flip over gable ladder sub-assembly and fasten Screws SXA to (3) URB with 3" screws (Fig. B). Flush Repeat steps 1 - 2 to build the 2nd gable ladder.
Page 35
Secure ladder assemblies together with (4) 3" screws, angled (Fig. F). Fig. F Flush HINT: Pre drill to avoid splitting wood. 3" (7,6 cm) Screws Flush at peak Install gable unit primed side down on gable ladders. Ensure panels are flush at peak of ladder and flush along top edge of ladder assembly. Secure with 1-5/8" screws spaced evenly, as shown (Fig. G). 1-5/8" (4,1 cm) Fig. G Screws Flush Flush 7-1/2"...
Page 36
(3,8 cm ) (3,8 cm ) Fig. A Measure and Measure and Mark Mark 3" (7,6 cm) Screws Working inside, secure gable unit with (2) 3" screws angled into MHA at an angle (Fig. A). FINISH Your gable unit is installed.
Page 37
FRONT GABLE L-blocks PARTS REQUIRED: 3" (7,6 cm) 2 x 6 x 3-5/8" (5,1 x 15,2 x 9,2 cm) 2 x 6 x 5-1/4" (5,1 x 15,2 x 13,3 cm) BEGIN Build two L-blocks by attaching AYB to LUA with (2) 3" screws (Fig. A). 3" (7,6 cm) Fig. A Screws 5-1/2" (14 cm) HINT: 3-5/8" (9,2 cm) Pre drill to avoid splitting wood.
Page 38
Ensure overhang boards meet at peak (Fig. A). BEGIN Install 61-5/16" overhang boards flush at peak, primed side down and flush to wall panels (Fig A). Secure panels to frame with (20) 1-1/4" screws spaced evenly. 61-5/16" Fig. A 1-1/4" (3,2 cm) Screws Center and flush 16" at peak (40,6 cm) Approximately Primed Side Down Flush to wall 1-1/4" (3,2 cm) Screws FINISH Your gable soffit panels are installed...
SOFFIT NAILERS PARTS REQUIRED: 3/8" x 2" x 5" (1 x 5,1 x 12,7 cm) 2" (5,1 cm) 5/8" x 1-1/2" x 46-3/4" (1,6 x 3,8 x 118,7 cm) OSB 1-1/4" (3,2 cm) 5/8" x 1-1/2" x 96" (1,6 x 3,8 x 243,2 cm) OSB BEGIN At the back of the shed, install 2" x 5" soffit filler flush to bottom and outside edges of rafter (Fig. A). Fasten with (2) 1-1/4" screws as shown. Repeat on opposite side. Mark wall at each rafter with a square flush to bottom side of rafter and side wall (Fig. B). Install 46-3/4" soffit flush to 96" soffit and marks. Fasten at each mark with 2" nails angled into the studs (nail into studs) (Fig. C). Repeat steps on opposite side.
EAVE SOFFIT PARTS REQUIRED: 1-1/4" (3,2 cm) 3/8 x 5-3/16 x 71-1/4" (1 x 13,2 x 181 cm) 3/8 x 5-3/16 x 79-3/4" (1 x 13,2 x 202,6 cm) Install soffit panels with the primed side facing out. BEGIN Install 79-3/4" and 71-1/4" soffit panels on bottom side of rafter and nailer. Flush soffit board to front corner of overhang L-block (Fig. A), side wall panels and nailer (Fig. B). Secure with 1-1/4" screws 12" apart and angled into rafter at seam (Fig. B, Fig. C). Repeat steps on opposite side.
Page 41
ROOF PANELS PARTS REQUIRED: 7/16 x 21 x 23-1/4" 2" (5,1 cm) (1,1 x 53,3 x 59,1 cm) 7/16 x 21 x 96" 7/16 x 21 x 31-3/4" (1,1 x 53,3 x 243,2 cm) (1,1 x 53.3 x 80,6 cm) 3/4" GAUGE BLOCK 7/16 x 48 x 23-1/4" (1,1 x 121,9 x 59,1 cm) 7/16 x 31-3/4 x 48"...
Page 42
Secure with (2) 2" nails into each panel, as shown. Flush 21"x 31-3/4" Flush Fig. E Fig. F Push or pull gable unit in or out until roof panel is flush to the outside of Flush Flush gable framing (Fig. E, Fig. F). Secure with (2) 2" nails into each panel, as shown.
Page 43
ROOF PANELS PARTS REQUIRED: Install roof panels flush to installed panels and flush to each edge, as shown. Install panels in the following order: 6" (15,2 cm) 1. 31-3/4"x 48" Flush 2. 21"x 96" 3. 23-1/4"x 48" 12" (30,5 cm) Secure roof panels with 2" nails spaced 6" apart along edges and 12" inside panels.
Page 44
(11,4 cm) 2" (5,1 cm) Finishing Nails Flush to top of OSB Flush to top of OSB Flush Flush roof panels roof panels 5-1/2" x 6-13/16" 5-1/2" x 6-13/16" Remove temporary roof ledger boards. FINISH Your front gable trim is installed.
Page 45
FRONT OVERHANG TRIM PARTS REQUIRED: 1-1/4" (3,2 cm) 3/8 x 4-3/8 x 8-1/2" (1,0 x 11,1 x 21,6 cm) Install trim with the primed side facing out. BEGIN Install overhang corner soffit trim boards, as shown (Fig. A). Secure parts with 1-1/4" screws. Fig. A 1-1/4" (3,2 cm) Screws Flush Flush 4-3/8 x 8-1/2" 4-3/8 x 8-1/2" FINISH Your corner soffit trim is now installed.
Page 46
EAVE FASCIA PARTS REQUIRED: 2" (5,1 cm) 3/8 x 3-1/8 x 71-1/4" (1 x 7,9 x 181 cm) 3/8 x 3-1/8 x 79-3/4" (1 x 7,9 x 202,6 cm) Install trim with the primed side facing out. ¸ BEGIN Install eave fascia boards flush to rafters and flush to roof panels (Fig. A). Secure with (2) 2" finishing nails at each rafter and (4) 2" finishing nails at seam. Repeat step 1 to install fascia on opposite side. 3/8 x 3-1/8 x 71-1/4" 3/8 x 3-1/8 x 79-3/4" SEAM 3/8 x 3-1/8 x 71-1/4"...
Page 47
Flush Flush Flush to top of OSB Flush to top of OSB roof panels roof panels 5-1/2" x 6-13/16" 5-1/2" x 6-13/16" Primed side out Primed side out Remove temporary roof ledger boards. FINISH Your rear gable trim is installed.
Page 48
COLLAR TIES PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 46-1/2" (5,1 x 10,2 x 118,1 cm) BEGIN Install collar ties OP on 3rd and 5th rafters from back wall. Flush OP to roof panels. Secure with 3" nails, as shown. HINT: For best appearance install OP on rafter facing away from door. Flush Flush 3"...
Page 49
DOORS PARTS REQUIRED: 3" (7,6 cm) Temporary Support 69" (175,3 cm) Door Stiffener 1-1/4" (3,2 cm) 1 x 3 x 5" (2,5 x 7,6 x 12,7 cm) Left Door Right Door BEGIN Arrange parts as shown on flat surface. Ensure 3/8" offset is to top. Look for red (right) and green (left) on hinge board. Install temporary supports OO and GAA, as shown.
Page 50
DOORS PARTS REQUIRED: Temporary Support 3" (7,6 cm) 69" (175,3 cm) Door Stiffener Install OO as a temporary support, flush under panels. Secure to floor frame with (2) 3" screws (Fig. A). Fig. A Flush against wall panels Center doors on panel seam, as shown (Fig. B). Screw hinge boards into wall supports and floor with (10) 3" screws as shown. Make sure screws go into framing and floor (Fig. C). Remove temporary supports and ensure that the doors open properly.
Page 51
DOOR TRIM PARTS REQUIRED: 3/4" (1,9 cm) 2" (5,1 cm) 19/32 x 2-1/2" x 64-7/16" (1,5 x 6,4 x 163,7 cm) 56" Metal Threshold 3/4" (1,9 cm) x11 19/32 x 2-1/2" x 22-5/8" (1,5 x 6,4 x 57,5 cm) Bagged seperately / special coating See page 50 for door trim options. BEGIN Reinforce the door and install horizontal door rails FA. Secure trim with 3/4" screws from behind door panel into trim (Fig. A, B). Center trim DNA over doors and secure with (5) 2" finishing nails. 3/4" (1,9 cm) Screws 2"...
Page 52
DOOR TRIM OPTIONS PARTS REQUIRED: 19/32 x 2-1/2 x 22-5/8" (2,5 x 6,3 x 57,5 cm) 19/32 x 2-1/2 x 59" (2,5 x 6,3 x 149,9 cm) 19/32 x 2-1/2 x 59" (2,5 x 6,3 x 149,9 cm) Follow standard door trim installation steps on page 49. Choose from 4 optional designs for your doors. If you prefer the vertical trim board style, cut ACL and ACR to 44-1/4" or 55-1/2". CENTER CENTER 44-1/4"...
Page 53
DOOR STIFFENERS PARTS REQUIRED: 2" (5,1 cm) 69" (175,3 cm) Door Stiffener BEGIN Center OO’s vertically on the left and right doors as shown (Fig. A, Fig. B). Secure with (7) 2" screws through outside trim into OO (Fig. B). Center OO in door Fig.
DOOR HARDWARE PARTS REQUIRED: 1" (2,5 cm) 5/16" (0,8 cm) Drill Bit BEGIN Place spring bolt onto OO in open position with bolt end 3/8" down from frame. Bolt is open when loop is contacting base (Fig A). Mark and pre-drill holes for screws. Install bolt with screws supplied and drill 5/16" hole for bolt to extend into. Place bolt onto OO in open position with bolt end 1/2" up from floor. Bolt is open when loop is contacting base (Fig B). Mark and pre-drill holes for screws.
DOOR HARDWARE / DECORATIVE HINGES PARTS REQUIRED: 1-1/2" (3,8 cm) 3/8" (10,9 cm) Drill Bit 3/4" (1,9 cm) 1/4" (0,6 cm) Drill Bit BEGIN Measure and mark location of hole on outside of right door as shown (Fig. A). Pre-drill hole with 1/4" drill. Re-drill hole with 3/8 " drill. Keep drilled hole square to trim to avoid breaking edge of Flush to hinge door stiffener. RIGHT DOOR Fig.
Page 56
GABLE PEAK PARTS REQUIRED: 2" (5,1 cm) 7-1/4 x 18-1/4" (18,4 x 46,4 cm) WITH WOOD GRAIN ON FACE BEGIN Install gable peak flush to peak of overhang as shown. Secure with (4) 2" finishing nails. Primed side 2" (5,1 cm) Finishing Nails FINISH Your front gable peak trim is installed.
Page 57
GABLE WINDOW PARTS REQUIRED: 1-1/4" (3,2 cm) BEGIN Apply high quality exterior-grade caulk behind frame near edge before installing to seal window. From outside of shed, position window in opening and level. Secure with (2) screws at top of windows. Do not fully tighten screws. 1-1/4" (3,2 cm)
Page 58
WINDOWS TRIM PARTS REQUIRED: 2" (5,1 cm) 19/32 x 2-1/2 x 9" (1,5 x 6,4 x 22,9 cm) 19/32 x 2-1/2 x 36-3/4" (1,5 x 6,4 x 93,3 cm) Center WA 3/4" on window frame. Secure with (2) 2" finishing nails as shown. Do not nail into window flange. Flush Flush 3/4" (1,9 cm) Centered Install EY on on window frame as shown. Secure using (2) 2" finishing nails. Remove 1-1/4" screws. Remove screws 31" (78,7 cm) Centered Avoid nailing EY x 2 into metal Flush window flange Install WA centered on window frame, as shown. Secure with (2) 2" finishing nails. Centered You must caulk completely around window frame to validate your warranty.
Page 59
GABLE WINDOW PARTS REQUIRED: 3/4" (1,9 cm) From inside, secure trim with (12) 3/4" screws. Snip protruding finish nails. Do not screw into window flange. 3/4" (1,9 cm) INSIDE OF SHED Screws 3/4" (1,9 cm) Screws Snip off 2" nails protruding through panel. FINISH Your window is now installed.
Page 60
Repeat steps 1 - 2 to install trim to all four corners. FRONT BACK Fig. A Fig. B 70-1/2" on gable walls Flush under gable panel Flush under 67-9/16" Flush under gable panel on eave soffit panel Flush under soffit panel walls Seam is flush.
Page 61
HOOK & EYE PARTS REQUIRED: Hook BEGIN Install hooks into endcap and into L-block behind (Fig. A). Swing doors open to locate eyes. Fig. A Hook FINISH Your hooks and eyes are installed.
Page 62
VENTS PARTS REQUIRED: 1/2" (1,3 cm) 8" x 16" (20,3 x 35,6 cm) ¸ BEGIN Install (1) vent near the floor and (1) vent near the eave. Install vents on opposing walls. Mark locations for vents in side walls. Caulk behind vent flange. Secure with 1/2" screws. Upper Side Wall Vent 3"– 5" (7,6 – 12,7 cm) Caulk 4-1/4" (10,8 cm) 6" (15,2 cm) 14"...
Page 63
DRIP EDGE - NOT INCLUDED - • Install drip edge over roof felt on gable side and under roof felt on eave side (Fig. A). • Do not use nails on side of drip edge that hangs over side of building.
Page 64
SHINGLES - NOT INCLUDED - • Follow directions provided by manufacturer and these instructions. Familiarize yourself with a 3-Tab Shingle. Notch Notch SHINGLE NAIL PATTERN 1/2 " 1" Sealing Str (1,3 cm) 1" (2,5 cm) (2,5 cm) Half A Rain Slot Full Rain Slot NAILS NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS.
Page 65
SHINGLES continued... Beginning at front of shed, install first row of shingles with notch at 1" past roof edge or flush with drip edge. Roof Deck FRONT OF BACK OF SHED SHED 1" (2,5 cm) Flush with starter row. Notch - or - Drip Edge Flush with starter row. Notch Install second row of shingles flush at top of first row's rain slots. Ensure 1" overhang or flush to drip edge at front, stagger each row. FRONT OF BACK OF SHED SHED 1" (2,5 cm) Notch Flush with rain slots.
Page 66
SHINGLES continued... Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as shown below. If shingles overlap at ridge cut to peak with a utility knife. 5"...
Page 67
SHINGLES - RIDGE CAP • You will finish off the top of the roof with a ridge cap made from shingles. BEGIN Cut shingles into THREE pieces. Hint: cut-off pieces first. 2" 2" (5 cm) (5 cm 2" 2" 2" 2" (5 cm) (5 cm) (5 cm) (5 cm) Score shingle, then snap-off angled cut. Weather Seal Top of slot. Note: •...
Page 68
SHINGLES - RIDGE CAP continued... Continue installing ridge cap to back of roof. Make sure there is 4" between the shingle-color and edge of shingles. 4" (10 cm) Trim cap off flush to shingles When you have 4" minimum of shingle color cut one piece to cap your roof. Cut at top of rain slot.
Page 69
19/32 TST 2 1/2" X 64 7/16" @ 16* B/E UT64070208016 19/32 X 4 SMART TRIM Gable Trim *19/32 TST 3-1/2" X 66-1/4" B/E 38.5* GABLE TRIM UT66040308385 Corner Soffit Cap RIGHT 19/32" X 5-1/2" X 6-13/16" Right Gable Cap...
Storage Buildings To validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit; shingle the roof and paint or solid-colored stain the siding using quality, 100% acrylic latex exterior product with a minimum of two (2) coats within thirty (30) days of assembly;...
Need help?
Do you have a question about the GABLE and is the answer not in the manual?
Questions and answers