Power And Communication Connections - TCS QWL2040 Installation Manual

Integrated building manager
Table of Contents

Advertisement

Installation

Power and Communication Connections

Make the following power and communication connections:
Power: Attach the included power supply to the side of the Panel and insert the plug into a 120VAC outlet. Upon
connection, the unit should power up automatically. If it does not, press the Reset button located on the front Indicator
Panel once to restart the unit.
Power
Ethernet
Side View
Exterior views
Cloud Connectivity Ethernet Port: Connect an Ethernet cable to the Ethernet port on the side of the Panel. Connect the
other end of the cable to your network switch port as determined by your local network administrator or IT department.
NOTE:
If using a cellular modem provided by TCS, connect the Ethernet cable to the LAN port on the modem (contact
TCS Technical Support at 800.288.9383, ext. 2 for additional information).
7
7
2800 Laura Lane • Middleton, WI 53562
CH|ON|DESCRIPTION
1
2
3
4
5
6
7
8
WARNING
LOW VOLTAGE PANEL:
24VAC
50/60 Hz ONLY
Front View
|
800.288.9383
|
www.tcsbasys.com
Indicator
Panel
Reset
Button
Mounting
Holes
Building Automation Systems

Advertisement

Table of Contents
loading

Table of Contents