Hardware Verification

Î
4
- Verify that the OK LED lights up.
- Verify that the ALARM LED is off.
7510 DSU
56/64K
- Verify that the User Interface Idle screen is displayed on the terminal or PC.
Press the Enter key. Verify that the Main Menu appears.
main
Device Name:
––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
Ctrl-a to access these functions
If the DSU fails to respond as described, refer to Chapter 6, Messages and
Troubleshooting , in the User's Guide.