Download Print this page

Sealey HPT500.V2 Manual page 2

Hydraulic scissor lift platform table

Advertisement

3. SPECIFICATION
Model: .......................................................... HPT400H.V2
Capacity: .................................................................300kg
Max platform height: ............................................1290mm
Min platform height: ...............................................360mm
Platform length: .....................................................910mm
Platform width: .......................................................500mm
4. ASSEMBLY
4.1.
A minimum of two people will be required to lift the truck out of its packaging. Alternatively, cut and fold down flat one end of the box and
wheel the truck out.
4.2.
FITTING THE HANDLE
4.2.1.
At the back of the truck there are two upstanding sockets to receive the bent loop handle, fig.1D.
Partially unscrew the two locking bolts that pass into the sockets so that they no longer protrude into the sockets. Drop the ends of the
bent chrome handle into the sockets and tighten the bolts until the handle is held firmly.
4.2.2.
Model HPT400H has a different handle fixing arrangement. The ends of the chrome handle have flanges which sit down onto flat
platforms at either side of the truck, see fig.5X. The handle is retained by two large socket cap bolts inserted from underneath. You will
require a 10mm hex Key to tighten the bolts. Place a split washer followed by a plain washer over each bolt before inserting and
tightening.
4.3.
FITTING THE FOOT PEDAL
4.3.1.
Slide the end of the foot pedal into the socket situated centrally between the two handle uprights, see fig.1E. On some models the
foot pedal retaining bolt, see fig.1F, screws directly into the material of the foot pedal stem. In this case place a split washer over the bolt
followed by a plain washer, before inserting the bolt. On other models the bolt passes directly through the stem and the socket and is
retained with a plain washer followed by a split washer followed by a nut. Ensure the fixing arrangement is tight enough to hold the pedal
firmly in place (do not over tighten).
4.4.
CONNECTING THE CONTROL CABLE
4.4.1.
Remove the cable guide bush, fig.2B, from the free end of the cable and feed the end of the cable and cable sheath through the cable
guide tubes welded to the handle and the underside of the frame. See fig.1G and fig.2A. The exact position and number of the guides
may vary from model to model. Once the cable has been fed through the guides slide the bush back over the cable and onto the sheath.
4.4.2.
Feed the cable through the hole in the bush retaining bracket and then through the hole in the clamping bolt on the actuating lever, see
fig.2C. Now screw the guide bush into the bracket with a 12mm spanner, see fig.2B. Pull the end of the cable to so that there is no
play in the movement of the lever mounted on the handle. Hold the clamping bolt, fig.2C steady with a 12mm ring spanner and tighten the
nut on the other side of the lever with a 13mm ring spanner.
fig.1
© Jack Sealey Limited
fig.3
Original Language Version
Model No ........................................................ HPT500.V2
Capacity: .................................................................500kg
Max platform height: ..............................................860mm
Min platform height: ...............................................280mm
Platform length: .....................................................815mm
Platform width: .......................................................500mm
fig.4
HPT400H.V2, HPT500.V2
fig.2
Issue:3 (H,3,F) 05/09/23

Advertisement

loading

This manual is also suitable for:

Hpt400h.v2