Unpacking; Setup - IBM 3270 G Manual

Table of Contents

Advertisement

Unpacking
Setup
System unit
Expansion unit (if installed)
Printer (if installed)
Plotter (if installed)
CAUTION
The power attachment cable plug (when supplied) is
approved for use with this machine and meets the
relevant testing laboratory or country/test-house
standards. For the user's safety, the plug must be
connected to a properly wired and grounded receptacle.
An improperly wired receptacle could place a hazardous
voltage on accessible metal parts of the machine. The
customer is responsible for receptacle wiring.
The work station is delivered with Unpacking Instructions attached to the
shipping carton; these instructions describe how to unpack the various
elements of the work station. The final instruction directs the reader to the
setup instructions contained in the Guide to Operations manual which is
shipped with the work station.
The other manual shipped with the work station is a Maintenance
Information manual, which should be stored for the service engineer.
Note: We recommend that you keep the packing materials if you intend to
use a Service Exchange Center for maintenance.
The physical characteristics and environmental requirements of the work
stations allow it to be set up in a normal office by customer personnel with
a minimum of special arrangements.
After the work station is unpacked and placed in its prepared location, it is
set up and checked out by using the step-by-step procedures contained in
the the Guide to Operations manual. The setup procedure involves:
1.
Checking the voltage rating of the equipment.
2.
Positioning the various elements of the work station.
3.
Connecting the elements (see Note below).
4.
Switching on the power and running tests on the basic work station.
Chapter 7. Preparing for the Work Station
85

Advertisement

Table of Contents
loading

This manual is also suitable for:

3270 gx

Table of Contents