IS194 Rev.05 19/12/2022 BIONIK8 Barriera automatica Brushless Automatic barrier Brushless Automatisierung für Schranke Brushless Barrière automatique Brushless Barrera automática Brushless Barreira automática Brushless Szlaban automatyczny Brushless ISTRUZIONI E AVVERTENZE PER L’INSTALLATORE INSTRUCTIONS AND RECOMMENDATIONS FOR THE INSTALLER ANWEISUNGEN UND HINWEISE FÜR DEN INSTALLATEUR INSTRUCTIONS ET AVERTISSEMENTS POUR L’INSTALLATEUR...
1 GENERAL SAFETY PRECAUTIONS Failure to respect the information given in this manual may cause personal injury or damage to the device. 2 SYMBOLS Generic danger Useful information Refer to the Installation and use instructions 3 DECLARATION OF CONFORMITY Roger Technology - Via Botticelli 8, 31021 Bonisiolo di Mogliano V.to (TV) •...
BI/008 BI/008/115 7 STANDARD DIMENSIONS MAX = 8000 Note: all measurements are expressed in mm unless otherwise indicated. 8 PACKAGE CONTENT COMPLETE BIONIK8 BARRIER CABINET WITH INTEGRATED CONTROL UNIT HEAD COMPLETE WITH DIFFUSER AND FLASHING LAMP UNIT ACCESSORIES BOLTS AND SCREWS...
9 TECHNICAL CHARACTERISTICS BI/008 BI/008/115 POWER SUPPLY MOTOR POWER SUPPLY STARTING POWER 300 W 300 W POWER CONSUMPTION 0 ÷ 18 A 0 ÷ 18 A TORQUE OPEN / CLOSE TIME CONTROL SYSTEM ABSOLUTE DIGITAL ENCODER ABSOLUTE DIGITAL ENCODER OPERATING CYCLES PER DAY 2500 2500 (OPENING/CLOSING - 24 HOURS NO STOP) **...
Page 5
11 REFERENCES AND ACCESSORIES 15 16 17 18 Code Description Code Description BAFS/01 BAFS/03 BAFS/02 JNT/BA/128 BAFS/04 BA/128/4 BAFS/05 KT231 BAMS/01 BAMS/01/EXT BI/BAT/KIT CTRL BI/BCHP KT239 KT242 ALED/8C SP/85/AS/02 R99/BASB20 BARK/02 RS/GR1/100 KT244 ATTENTION! For the correct installation and use of the accessories refer to the respective instruction manuals.
Page 8
12.4 Selecting direction of aperture side (seen from the inspection hatch side). INSTALLATION OF THE LEFT Whenever corrective actions are carried out, pay the utmost attention when releasing, locking or moving the internal mechanical parts. These operations could be hazardous for the installer. INSTALLATION ON THE RIGHT BARRIER INSTALLED ON THE RIGHT (seen from the inspection hatch side)
Page 10
13.3 Installation procedure [A]. UNION OF THE TWO BOOMS L x10 L x10 BOOM AND SUPPORT FIXING L x5 L x4 L x5 ATTENTION: Insert the connector M2 COMPLETELY INSIDE the boom.
Page 11
14 INSTALLING AND ADJUSTING THE SPRING rubber and LED strips. BI/008 BAFS/05 must be used. BAFS/05 must be used. BAFS/05 must be used. WARNING! Images are purely indicative, for correct installation and use of the accessories refer to the respective instruction manuals.
Page 12
14.1 Installation and adjustment of the balancing unit • [CU] • [CU] • [CU] SET SP/85/AS/02 • • 14.2 Slider selection • • • • SLIDER 1 - CU1 SLIDER 2 - CU2 Example 1 Example 1 180° 180° Example 2 Example 2...
Page 13
14.3 Spring unit installation SP/85/AS/02 CAUTION • • RS/GR1/100 LATO INTERNO (BARRIERA) INTERNAL SIDE (BARRIER) Lithium OBBLIGATORIO LUBRIFICARE! OBLIGATORY TO LUBRICATE! LATO INTERNO LATO ESTERNO (BARRIERA) EXTERNAL SIDE INTERNAL SIDE (BARRIER) Lato Esterno External side LATO ESTERNO EXTERNAL SIDE 1. VITE - SCREW 2.
Page 14
14.4 Spring adjustment • • >45° 45° <45°...