Page 1
Sauna 400, Ø200 NB! Please read whole manual before start. All given measurements are in millimeters! (I20-PES-PES-PTS-016)
Page 2
Wall configuration. Windows are optional! Middle wall Front wall (PES) (PES) Back wall (PTS) (PK) (I20-PES-PES-PTS-016)
Page 3
Wooden front and middle wall assembly Details 16x J Cut board from pallet L=~1900mm. Fix it diagonally to make wall more rigid during the installation. 2x I (I20-PES-PES-PTS-016)
Page 4
Wooden back wall assembly Details Cut board from pallet L=~1900 mm. 4x I Brackets inside. (I20-PES-PES-PTS-016)
Page 7
Sauna 400, Ø200 Back mm=mm DET 1 6x M mm=mm 2xDET A 1600 Front DET 1 6x M DET 1 (I20-PES-PES-PTS-016)
Page 8
Sauna 400, Ø200 3x M DET 2 mm=mm DET 3a DET 3b mm=mm (I20-PES-PES-PTS-016)
Page 9
Sauna 400, Ø200 24x M (I20-PES-PES-PTS-016)
Page 10
Sauna 400, Ø200 Use waterlevel 4x H Check walls installation manual on extra pages! Sauna wall configuration depends on Your model! Brackets inside DET 3a DET 3b Fix temporarily to support walls. 6x H Important! Leave the gap ~7 mm.
Page 11
Sauna 400, Ø200 Remove Important! Leave the gap ~7 mm. DET 3a DET 3b See the next page. DET 3a DET 3b (I20-PES-PES-PTS-016)
Page 12
Sauna 400, Ø200 DET 6b DET 6a Lift nose slightly up before installing combined detail. Connect 2 halves, use proper size screws. (I20-PES-PES-PTS-016)
Page 13
Sauna 400, Ø200 2x DET B DET B1 DET B ~240 mm DET B1 DET B Place the collar against the leg. (I20-PES-PES-PTS-016)
Page 14
Sauna 400, Ø200 2x DET B DET B1 Remove all screws DET B Do not! remove the screws if you sauna is made from thermowood! Proceed same way as Place the collar Remove all described on the previous page against the leg.
Page 15
Sauna 400, Ø200 Dressing room Sauna room 4x DET 10a 4x DET 10a ~560 12x H 12x H NB! If Your sauna equipped with front glass-wall, the sauna benches installation manual included in front glass-wall installation manual. Drill holes Ø4mm Install DET 10b in the Drill holes Ø4mm...
Page 16
Sauna 400, Ø200 2x DET 10 2x DET 11 Leave the space ~10 mm between wall and DET 12a 16x H 1x DET 12a 2x H 2x DET L 1x DET 14a 4x H 1x DET 14b 1x DET 14c...
Page 17
Sauna 400, Ø200 2x J 2x DET 15a 2x H 2x DET 15b Cut from this side if needed! If Your sauna heater is smaller, You can cut DET 15a to size, that suits with Your heater. 2x DET 15c Place saunaheater first.
Page 18
Sauna 400, Ø200 Front view. Back view. Measure windows and add Measure windows and add Mark windows opening! Mark windows opening! 5 mm. to each side 5 mm. to each side min.720 min.65 DET 8 X+10 X+10 X+10 X+10 NB! Only if Your sauna equipped with front windows!
Page 19
Sauna 400, Ø200 Horizontally fix screws 4x DET 8a in every board. 4x DET 8b 2x DET 20a 2x DET 20b 16x J 20x J 18x J 24x J Horizontally fix screws 4x DET 8a DET 8 in every board.
Page 20
Sauna 400, Ø200 2x M 1x DET 21 2x DET 21c X=Wall thickness 2x DET 21d 2x M Push door against the wall and fix it from inside. 2x DET 20a 2x DET 20b 16x J 18x H 8x H...
Page 21
Sauna 400, Ø200 2x M 2x DET 24 2x DET 10c 8x H 2x H 16x H 2x DET 22 (I20-PES-PES-PTS-016)
Page 22
Sauna 400, Ø200 DET N NB! Check also shingles installation manual inside shingles package. Shingles overlap ~10mm on top Check also roof shingles installation manual inside package. Refract DET N into 3 pieces. DET N Cut and use DET O it other end.
Page 23
Sauna 400, Ø200 8xDET 25 8xDET 25 16x H 16x H Remove DET A (I20-PES-PES-PTS-016)
Need help?
Do you have a question about the Sauna 400 and is the answer not in the manual?
Questions and answers