Hitachi RCD-0.8FSN3 Installation And Operation Manual page 42

Indoor units system free
Hide thumbs Also See for RCD-0.8FSN3:
Table of Contents

Advertisement

Available languages

Available languages

MAIN SAFETY AND CONTROL DEVICES
19.2 START TEST RUN
After the installation work is completed, test run should be performed.
1 Check to ensure that stop valves (gas and liquid) of the outdoor unit are fully opened.
2 In the case that indoor units are connected to the VRF system, perform the test run of the indoor unit one by one sequentially
and then check accordance of the refrigerant piping system and the electrical wiring system. (If the multiple indoor units are
operated simultaneously, the system can not be inspected the system accordance.).
3 Perform the test run according to the "Installation and Operation Manual" of PC-ARF(PE) remote control.
20 MAIN SAFETY AND CONTROL DEVICES
Model
For Evaporator Fan Motor
Internal Thermostat
For Control Circuit
Fuse capacity
Freeze Protection
Thermostat
Thermostat
Differential
38
PMML0425A rev.0 - 02/2016 - P5415720
RCD-0.8FSN3, RCD-1.0FSN3, RCD-1.5FSN3, RCD-2.0FSN3, RCD-2.5FSN3,
Cut-Out
C
o
A
Cut-Out
C
o
Cut-In
C
o
C
o
RCD-3.0FSN3, RCD-4.0FSN3, RCD-5.0FSN3, RCD-6.0FSN3
Automatic Reset, Non-Adjustable
100+4
5
0
14
2

Advertisement

Table of Contents
loading

Table of Contents