Connection Screen; Checking Connections; Switching On The Device; Switching Off The Device - ebm-papst W1G200EC9110-CT1 Operating Instructions Manual

Table of Contents

Advertisement

Part Number
W1G200EC9110-CT1
Operating Instructions
Fans installed in upright position
Fig. 2: Cable routing for fans installed upright.
NOTE
Perform cable routing whenever the ESM plug-in
module is used to connect the fan.

4.4 Connection Screen

4.5 Checking connections

 Ensure isolation from supply (all phases).
 Make sure a restart is impossible
 Check the cables for proper fit.
Item no. LS-188.
ebm-papst A&NZ Pty Ltd
10 Oxford Road · Laverton North VIC 3026 · Phone +61 (03) 9360 6400 · Fax +61 (03) 9360 6464
ABN 33 115 927 556
NSW Phone +61 (02) 9827 6400 · NSW Fax +61 (02) 9827 6464 · NZ Phone +64 (09) 525 0245 · NZ Fax +64 (09) 525 0246
sales@ebmpapst.com.au · www.ebmpapst.com.au

4.6 Switching on the device

The device may only be switched on if it has been installed
properly and in accordance with its intended use, including the
required safety mechanisms and professional electrical
connections. This also applies for devices which have already
been equipped with plugs and terminals or similar connectors by
the customer.

4.7 Switching off the device

Disconnect the device from the supply voltage at the main
switch for the supply line.
When disconnecting, be sure to disconnect the earth wire
connection last.
Revision 001
Release 24/09/2018
WARNING
Hot motor housing
Risk of fire
Ensure that no combustible or flammable
materials are located close to the fan.
Before switching on, check the device for visible
external damage and ensure any external
protective devices are functional.
Apply the nominal supply voltage
NOTE
Damage to the device from vibration
Bearing damage, shorter service life
Low-vibration operation of the device must be
ensured over the entire speed control range.
Severe vibration can be caused by component
or structural resonance.
Speed ranges with excessively high vibration
levels and possible resonant frequencies must
be determined in the course of fan
commissioning. Either run through the resonant
ranges as quickly as possible with speed control
or find another remedy. Operation with
excessively high vibration levels can lead to
premature failure.
Page 7 of 9

Advertisement

Table of Contents
loading

Table of Contents