Advertisement

Quick Links

Installation
Manual
BKH 5.0 Tunnel
42-66
©2023

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BKH 5.0 Tunnel 42-66 green and is the answer not in the manual?

Questions and answers

Summary of Contents for Brunner BKH 5.0 Tunnel 42-66 green

  • Page 1 Installation Manual BKH 5.0 Tunnel 42-66 ©2023...
  • Page 2: Table Of Contents

    Frame variants......................83 Conversions, settings....................87 12.1 Change: door hinge........................87 12.2 Adjusting of self-closing door....................100 12.3 Modification - lifting door: “non self closing”................108 Disposal........................111 Technical data......................112 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 3: Basic Informations

    Please notify your supplier of any damage which might have occurred during transport. Please keep these instructions. Please also take note of the online product documentation provided General instructions of the Brunner products installation for the stove construction. (https://www.brunner.de/produktdownloads/kacheloefen-kamine/allge- meine-hinweise-fuer-den-aufbau_de.pdf) laden können.
  • Page 4: Specified Symbols

    There is a certain risk, which can lead to a malfunction or damage of the related system and all devices connected with it, if the indicated notifications are not followed. Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 5 NOTE Additional helpful information © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 6: Delivery Contents Bkh 42-66 Tunnel

    With the EAS version, only one door contact switch is installed on the operating side. With ST-DT the ST side is therefore the operable side. Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 7 Attention: Tunnel inserts can only be operated on one side, the other side is equipped with an inspection handle. With the EAS version, only one door contact switch is installed on the operating side. © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 8 Supply air connection box ⌀ 125 mm with EOS / EAS HK000080 for side-opening door HK004150-01 HK004150-01 Door frame, black for lifting door HK005152-01 Mounting frame, black ST 60mm HK005150-01 Heat protection panel HK014251 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 9: Catalytic Converter (Optional)

    This catalytic converter is suitable for all BKH units (with lifting door, with side opening door, tunnel, with cast dome, with heat exchanger cast rings and MAS). This catalytic converter can also be retrofitted. © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 10: Air Connection Box (Optional)

    *both clamp plates are supplied, but only the appropriate one is used. HEAT EXCHANGER RINGS (OPTIONAL) separate package (4x threaded rod, 4x hexagon nut) deflection heat exchanger ( 2x) cast iron heat exchanger rings ( 2x) Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 11: Heat Protection Panel For Tunnel Dt-Dt

    *INFO: 1 are only required for BSK !!! Heat protection panel Fitting Inserting plate separate package SAFETY DISTANCES BKH TUNNEL Half-height version without heat protection panel with heat protection panel © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 12 All figures in cm When designing the exhaust system and exhaust pipe, national standards and fire protection regulations must be observed Floor-to-ceiling version without heat protection panel with heat protection panel Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 13 (accessories) non-combustible flooring /floor protection pane All figures in cm When designing the exhaust system and exhaust pipe, national standards and fire protection regulations must be observed © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 14: Setting Up

    As long as the device is on the wooden pallet, it can be transported with a hand truck or forklift as usual. REMOVE THE TRANSPORT LOCKS Side with side-opening door: NO TRANSPORT LOCK ! Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 15: Heat Protection Panel Tunnel Dt-Dt

    If you use heat protection panels, they should be mounted before positioning the fire- place insert. First mount the heat protection panels, then place the fireplace insert against the wall. © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 16 CAUTION Risk of injury from sharp edges! Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 17 Preparatory work © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 18 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 19 1 are only required for BSK © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 20 BKH + BSK : for BKH A = max. 1395 A = max. 1665 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 21 BKH + heat protection panel BKH + heat protection panel + BSK © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 22: Set Up The Fireplace

    With ST-DT the ST side is therefore the operable side. Summarised information Version without outside air connection BKH with side-opening door Workflow: Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 23 BHK with lifting door Workflow: © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 24: Variant With External Combustion Air Connection

    VARIANT WITH EXTERNAL COMBUSTION AIR CONNECTION Preparatory work Workflow: Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 25 - using aluxflex on 3 lateral parts (S) and al- so from the bottom (B). Once you have made a decision, break out the ap- propriate part and make the connections for the air supply. © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 26: Bottom Connection (B)

    With ST-DT the ST side is therefore the operable side. The images from this chapter are based on the example: BKH Tunnel DT/DT Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 27 Workflow: © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 28 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 29 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 30 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 31 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 32: Side Connection (S)

    With ST-DT the ST side is therefore the operable side. The images from this chapter are based on the example: BKH Tunnel DT/DT Workflow: Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 33 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 34 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 35 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 36 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 37: Variant With Eas Or Eos

    With ST-DT the ST side is therefore the operable side. The images from this chapter are based on the example: BKH Tunnel ST/DT © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 38 Workflow: Make the electrical connection Variants: cable routing right side or left side Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 39 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 40 INFO: Access Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 41 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 42 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 43 Variants cable routing - Thermocouple: right side or left side right side: left side: © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 44 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 45 Do not overtighten the screws! © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 46 Version : thermocou- ple right side Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 47 Version : thermocou- ple - left side © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 48: Fitting: Catalytic Converter

    FITTING: CATALYTIC CONVERTER Im. 5: Summarised information catalytic converter 2a+2b assembly tool Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 49 Workflow: © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 50 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 51 START STOP © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 52: Fitting: Deflection Combustion Chamber - Tunnel

    FITTING: DEFLECTION COMBUSTION CHAMBER - TUNNEL Summarised information: Support points for the deflector plates Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 53 Installation options are: from the front (ST or DT) and from behind (DT): © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 54 Workflow: Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 55 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 56 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 57 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 58 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 59 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 60 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 61: Variants Heat Exchanger

    VARIANTS HEAT EXCHANGER 10.1 CONNECTION WITH CATALYTIC CONVERTER Mounting catalytic converter: “ Fitting: catalytic converter” © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 62: Connection Without Catalytic Converter

    10.2 CONNECTION WITHOUT CATALYTIC CONVERTER Possible variants of the connection for the outlet of flue gases Position: cast iron dome - deflector plate Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 63 Examples for the position of the deflector plate - Connection variant for exhaust gases Example A: with rotating cast iron dome - at rear - vertical Example B: with rotating cast iron dome - left side - vertical or horizontal © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 64 Example C: with rotating cast iron dome - right side - vertical or horizontal Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 65 Principle of flue gas routing with heat exchanger rings Example D: with rotating cast iron dome with heat exchanger ring - to the left - vertical or horizontal © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 66: Heat Exchanger - Cast Iron Dome

    10.3 HEAT EXCHANGER - CAST IRON DOME vertical out- horizontal outlet INFO modification: see enclosed sheet - cast iron dome Workflow: Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 67 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 68 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 69: Heat Exchanger Rings

    10.4 HEAT EXCHANGER RINGS Mounting (ST = DT) Position as planned !! (see also chapter: “Connection without catalytic converter”) © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 70 Mounting (ST = DT) Position as planned !! (see also chapter: “Connection without catalytic converter”) Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 71 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 72 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 73 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 74 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 75: Heat Exchanger - Mas

    10.5 HEAT EXCHANGER - MAS Summarised information: © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 76 Workflow: Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 77 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 78 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 79 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 80 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 81 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 82 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 83: Frame Variants

    The installation of the add-on and blind frame is identical, regardless of which open- ing of the tunnel they are assembled. (Frame variants: see also chapter “Delivery contents”) © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 84 Mounting frame Workflow: Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 85 Door frame Workflow: © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 86 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 87: Conversions, Settings

    CONVERSIONS, SETTINGS 12.1 CHANGE: DOOR HINGE Additional info: https://www.brunner.de/de/ All work steps are identical to : Change- door hinge BKH flat DT © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 88 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 89 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 90 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 91 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 92 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 93 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 94 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 95 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 96 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 97 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 98 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 99 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 100: Adjusting Of Self-Closing Door

    12.2 ADJUSTING OF SELF-CLOSING DOOR Side : with side-opening door Side : with side-opening door All work steps are identical to : BKH flat DT -> without self-closing Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 101 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 102 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 103 BKH - DTL BKH - DTR DTL = side-opening door - left side DTR = side-opening door - right side © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 104 Mounting aid: Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 105 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 106 Mounting aid: Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 107 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 108: Modification - Lifting Door: "Non Self Closing

    12.3 MODIFICATION - LIFTING DOOR: “NON SELF CLOSING” R = L R = L R = right side L = left side Im. 6: Summarised information Workflow: Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 109 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 110 Installation Manual BKH 5.0 Tunnel 42-66 green (1.11) © 2023 Brunner GmbH...
  • Page 111: Disposal

    Please bring the used cacatalytic converter to a recycling center. Thank you very much for your efforts in supporting the protection of environment and sustainable use of re- sources. © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)
  • Page 112: Technical Data

    Dimension sheets - BKH Tunnel 42-66 green Ø180/200 Ø125/150 … side opening/side opening with mounting bracket and cast iron dome Stand: 2023-12-18...
  • Page 113 Dimension sheets - BKH Tunnel 42-66 green Ø180/200 Ø125/150 … side opening/side opening with door frame and cast iron dome Stand: 2023-12-18...
  • Page 114 Dimension sheets - BKH Tunnel 42-66 green Ø125/150 … side opening/side opening with mounting bracket and MAS Stand: 2023-12-18...
  • Page 115 Dimension sheets - BKH Tunnel 42-66 green Ø125/150 … side opening/side opening with door frame and MAS Stand: 2023-12-18...
  • Page 116 Dimension sheets - BKH Tunnel 42-66 green Ø180/200 Ø125/150 … side opening/side opening with mounting bracket and cast iron heat exchanger rings + dome Stand: 2023-12-18...
  • Page 117 Dimension sheets - BKH Tunnel 42-66 green Ø180/200 Ø125/150 … side opening/side opening with door frame and cast iron heat exchanger rings + dome Stand: 2023-12-18...
  • Page 118 Dimension sheets - BKH Tunnel 42-66 green Ø180/200 Ø125/150 … lifting door/side opening with mounting frame/mounting bracket and cast iron dome Stand: 2023-12-18...
  • Page 119 Dimension sheets - BKH Tunnel 42-66 green Ø180/200 Ø125/150 … lifting door/side opening with door frame and cast iron dome Stand: 2023-12-18...
  • Page 120 Dimension sheets - BKH Tunnel 42-66 green Ø125/150 … lifting door/side opening with mounting frame/mounting bracket and MAS Stand: 2023-12-18...
  • Page 121 Dimension sheets - BKH Tunnel 42-66 green Ø125/150 … lifting door/side opening with door frame and MAS Stand: 2023-12-18...
  • Page 122 Dimension sheets - BKH Tunnel 42-66 green Ø180/200 Ø125/150 … lifting door/side opening with mounting frame/mounting bracket and cast iron heat exchanger rings + dome Stand: 2023-12-18...
  • Page 123 … lifting door/side opening with door frame and cast iron heat exchanger rings + dome We suggest for CAD planning Palette CAD. Permanent updated drawings: www.brunner.de Frames/ flue gas outlet connection/ combustion air supply connection/ front variants/ support bearing are marked in col-...
  • Page 124 Planning and installation - BKH Tunnel 42-66 green Tested according to EN 13229 W EN 13229 WA Values measured at Rated power Storage operation Data for functional demonstration Rated heat power Fire wood volume kg/h Combustion performance Flue gas mass flow Flue gas temperature after: Cast iron dome °C...
  • Page 125 All information, drawings and technical descriptions contained in this documentation are our property and may not be reproduced without prior written permission. ® BRUNNER is a registered trademark. Subject to technical changes and errors. © by Ulrich Brunner GmbH Doku-Nr.: 202857 © 2023 Brunner GmbH Installation Manual BKH 5.0 Tunnel 42-66 green (1.11)

Table of Contents