Download Print this page

Standard Equipment - Black & Decker PROFESSIONAL WorkMate 2000 Operating Instructions Manual

Foldaway workbench

Advertisement

ASSEMBLY INSTRUCTIONS
With the legs in the
vertical position lock 5?
= J
the metal struts as shown
>- V,
Fig. 2
Remove the
WM2000 from
packaging
ensuring that the centreboard is clamped
securely between the vice jaws.
Place the WM2000 on floor as shown in
fig. 2 and release the two retaining
catches and open the first pair of legs,
with the legs in vertical position lock the
metal struts as shown.
Release the remaining set of legs and
follow above procedure.
Note:
Before placing
the WM2000 in the
upright
position ensuring all four
metal
struts
are locked securely.
STANDARD
EQUIPMENT
Each WM2000 is supplied with:
(A)
Four vice pegs - ideal for clamping
irregular shaped work pieces safely fig. 3.
(B)
Two jaw protectors
- ideal
for
gripping
pipes
etc,
securely
either
vertically or horizontally.
(C)
Two metal drawing board brackets
as shown in fig. 9.
Vice jaw protectors

Advertisement

loading

This manual is also suitable for:

Professional wm2000