■ Assembly of the left LED PCB and right LED PCB
9.2.9.
Setting the Power SW PCB
1. Connect the Cable to the Connector. (CN9)
2. Fix the Power SW PCB using the Screw. <N1>
Screws <N1> : DFHE5025XA
■ Assembly of the Power SW PCB
(Note) Arrow without specified measurement: 0 to 0.5 mm
Power SW PCB
0 1mm
Power Spring Sheet
0 1mm
Attach
Spring
Insert it to Knob and
Pin on the Top Case
Insert the Cushion
between the ribs.
Avoid coming over
Screw
Fold the board back and fix with screw.
LED(L) PCB Ass'y
LED PCB(L)
LED Light Guide Sheet(L)
Match the edge and attach it.
Avoid running over the LED.
Back side
0 3mm
LED PCB Tape(L)
LED(L) FPC
Match the edge and attach it.
Ensure it does not come over the end
of the Board by 0.5 mm or more.
Avoid coming over it.
Insert
S2
LED(R) PCB Ass'y
Match the edge and attach it.
LED Light Guide Sheet(R)
LED PWB Tape(R)
Match the edge and attach it.
<N1>
Connector(CN9)
Power SW
PCB
Safety Working
S1:Insulation S2:Pinching Cables S3:Sharp Edge
CAUTION
S4:Part No. Check S5:Others
47 / 90
LED PCB(R)