Start-Up
Prior to start-up ensure that equipment intended to be powered by the APC
transformer is connected properly to the transformer. Failure to do so may
cause the UPS to go into bypass mode for up to 30 seconds before beginning
normal operating prodedure.
1. Plug the transformer L6-30 connector into the UPS.
2. Connect all additional equipment to the transformer and the UPS.
3. Turn on all connected equipment.
4. Turn on the power to the UPS by pressing the
of the UPS.
All equipment intended for use with the APC transformer must be connected to
the transformer prior to using the Cold Start function.
41063-264-01(1)
1. Verify that the transformer input cord
unplugged.
2. Remove the voltage selection switch cover
3. Set the input voltage selection switch
the utility voltage of 208 V or 240 V.
a. If 240 V utility is used, program the UPS output
for 240 V. Refer to the UPS user manual.
b. Install the voltage selection switch cover
4. Plug applicable load equipment into the PDU
receptacles
on the transformer.
5. Plug the transformer input cord
appropriate PDU receptacle on the rear of the UPS.
6. Verify that the output circuit breakers
7. Verify that the input circuit breaker
button located on the front panel
Test
Installation
Œ
is
.
Ž
to match
.
Œ
into the
are ON.
'