• The transformer must be installed directly above the UPS in the rack.
• If your configuration includes the optional bypass panel, ensure that the bypass panel is
installed above the transformer in the rack. Refer to the bypass panel manual for installation
instructions.
• Refer to the RT Tower to Rack-Mount Conversion Guide and Rail Installation Guide
(1609-PRK1) for conversion and installation details.
4. Secure the transformer to the UPS.
a. Locate the two screws and three tie brackets
from the literature kit.
b. Secure the appropriate tie bracket with screws to
the top of the units
c. Reuse the screws removed in step 3 to secure tie
'
brackets
at the top and bottom of the units.
5. Reuse the screws removed in step 2 to secure the
'
covers to the UPS
and transformer
6. Install the transformer bezel