Download Print this page

Sears 917.253311 Owner's Manual page 4

46 inch dozer blade

Advertisement

UPPER MOUNTING
BRACKET--=--
-,..,
LOWER MOUNTING
-~---------~
BRACKET
FIGURE 5
5.
Assemble
Dozer Channel to Mounting Bracket using:
Hex Bolt,
Flat
Washer,
Lockwasher
and two
Hex
Nuts
(shown
full size
above) found
in
Bag of
Parts.
a.
Start
Hex Bolt from under
Lower
Mounting
Bracket
just
far
enough to
hold Flat Washer
on
top
side of Lower
Mounting
Bracket.
b.
Insert
Dozer Channel
between Upper
and
Lower
Mount-
ing
Brackets and slide
Hex
Bolt
through.
c.
Add
lockwasher
and one
Hex
Nut
and tigh
ten
securely
(Back Nut off
sl
ightly if necessary
to allow Channel to
rotate
freely).
d. Add second
Hex
Nut and tighten securely.
CONTROL
ARM
CONTROL
ARM PIN
LOWER
CONTROL
ROD EVE
DOZER CHANNEL
SHAFT
6.
Assemble
R.H.
Plate
and
L.H
.
Bracket to
ends
of Dozer
Channel
Shaft
using:
two Kliprings
(shown tull size above)
found
in
Bag
of
Parts
(Fig.
5)
.
7. Assemble Lift Lever Shaft
to
R.H.
Plate
using:
Flat Washer and Cotter
Pin
(shown full size above) found
in
Bag of Parts.
Swing R.H.
Plate up
and
position on
Lift
Lever
Shaft, place Flat Washer over shaft and
secure with
Cotter Pin.
8.
Assemble Lift Bracket
on
Lift Bar
using
:
Lift Pin
and
Retainer Spring (shown full size
above) found
in
Bag of Parts. Insert
lift
Pin through
Lift Bracket holes
and
Lift Bar slot
and secure
with
Retainer Spring
(Fig.
5).
_
2 _ 9. Place lower
Control
Rod
Eye in
Control
Arm Hole
(Fig.
5).
}
'

Advertisement

loading