Reece Posh Bristol 9504428 Installation Instructions

Freestanding baths

Advertisement

Prior To Installation

Ÿ Unwrap the bath and check it carefully to ensure it has not been damaged in handling or transport.
Ÿ Check that all parts have been supplied.
Ÿ Assemble bath on a mat to protect against damage to bath surface.
Ÿ Do not remove the old fixture before you unpack and inspect the new unit.
Ÿ Store the bath in a safe place until you begin installation to avoid damage.
Ÿ Any installation should be carried out by a qualified tradesman with knowledge of statutory plumbing
requirements in your area.
Ÿ This installation guide does not include details of waste connection; final decision about installation of
waste connection should be taken by a suitably qualified individual.

Installation

Install waste pipe and trap - taking into consideration the waste position of the bath. Make sure that the surface
where the bathtub will be placed is perfectly flat, free of any excess humidity and offers adequate support.
The bath should be supported by the legs, not by the rim. Adjust the feet to level and support bath from base.
Ensure all adjustable bath feet are level and load bearing. this can be done by using a spirit level on a flat surface
on the top of the bath. Check the bath is level along each axis.,
To make any height adjustments, the bath feet can be rotated to raise or lower the feet. Adjust bath feet until bath
is 3mm above the floor and once bath is level and the feet are in the correct position, the locking nut can be
tightened with a spanner to prevent the feet from moving further.
Measure the location of the bathtub feet in relation to the desired installation position. Mark on the floor the
location of the feet and use a marking pencil to draw a bath outline on the floor around the bath base.
Lift and tilt bath up on it's side and fit the waste. Water test the bath to check that it is draining correctly without and
leaks.
Silicone seal the bath with the corner wall and in position onto the floor and into 3mm gap between base of bath
and floor to seal it. Allow seal to fully cure for 24 hours before use.
A suggested bath component list for Slab floor or 2nd storey bath connection or Timber floor with clear access
underneath is listed on the next page:
Posh - Bristol Freestanding Baths
Posh Bristol Freestanding Baths
Installation Instructions
Page 01
of 02

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Posh Bristol 9504428 and is the answer not in the manual?

Questions and answers

Summary of Contents for Reece Posh Bristol 9504428

  • Page 1 Installation Instructions Posh Bristol Freestanding Baths Prior To Installation Ÿ Unwrap the bath and check it carefully to ensure it has not been damaged in handling or transport. Ÿ Check that all parts have been supplied. Ÿ Assemble bath on a mat to protect against damage to bath surface. Ÿ...
  • Page 2 Installation Instructions 1. Slab floor or 2nd storey suggested bath connection component list: -1405525 DWV Adaptor PVC X FI 40mm -1400105 40mm DWV PVC pipe (installer to cut to length) -Slab floor or 2nd storey bath connection Below floor smart trap Below floor smart pan Waste pipe into smart seal 2.

This manual is also suitable for:

Posh bristol 9504384

Table of Contents