Download Print this page

Advertisement

Quick Links

Thank you for purchasing our company's JYB20 (Beidou bulldozer leveling guidance system).
Please read this manual carefully before working, so that you can use this product quickly,
correctly and safely.
Disclaimer:
This document does not convey, by implication, estoppel, or otherwise, any right or license
under or under patents, trademarks, copyrights or titles of the Company or any third party.
The company is not responsible for any changes or deletions of relevant work data caused
by your use or inability to use this product.
Notice to users:
The display terminal is mounted at a convenient location for the driver using a RAM bracket.
For tractors without a cab, the instrument should be protected from sun exposure/rain, and
care must be taken to prevent the instrument from falling to the ground or being strongly
impacted by other objects.
· The power must be cut off before installing and disassembling each cable;
· Do not use hard objects when operating the display screen;
· Please connect your device strictly according to the requirements in this manual;
When supplying power, pay attention to the equipment power supply requirements (DC12V);
· Pay attention to take appropriate lightning protection measures to prevent lightning strikes;
The equipment is damaged due to force measure (lightning strike, high voltage, collision, etc.),
which is not within the scope of free maintenance of the company;
· It is forbidden to disassemble the product by yourself, otherwise the warranty will not be
granted;
· When using this system, it should be in an open field far away from the shelter;
· Please stay away from interference sources such as strong electric fields, magnetic fields,
high-voltage lines, and radio signal towers during use of the device.
List of main instruments:
name
Terminal
PCS
1
Radio
Remark
module
included
JYB20 Concise Manual
GNSS
Power
Camera
antenna
cable
2
1
Main
GNSS
cable
cable
1
1
2
1
Camera
RAM
adapter
bracket
Antenna
cable
1
1
4G
R26
base
1
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the JYB20 and is the answer not in the manual?

Questions and answers

Summary of Contents for SMAJAYU JYB20

  • Page 1 JYB20 Concise Manual Thank you for purchasing our company's JYB20 (Beidou bulldozer leveling guidance system). Please read this manual carefully before working, so that you can use this product quickly, correctly and safely. Disclaimer: This document does not convey, by implication, estoppel, or otherwise, any right or license under or under patents, trademarks, copyrights or titles of the Company or any third party.
  • Page 2: System Connection Diagram

    System connection diagram: ①: Display terminal: fixed at the convenient operation position of the cab; ②: GNSS cable: connect the display terminal to the GNSS antenna; ③: 4G antenna: connected to the display terminal; ④: GNSS antenna: connected to the display terminal through the antenna cable, fixed at a suitable position on the left side of the shovel body;...
  • Page 3 Job display information: Job operation process: 1. Set up a mobile base station (the network base station ignores this step); 2. Check whether the instrument is firmly fixed; 3. Check whether the cable is connected correctly; 4. Set the working datum: a.
  • Page 4 Common situation: The bulldozing shovel cannot continue to push the soil during leveling: click the "SET H" - "↓" icon to set the base level down by 3~5cm; 2. During leveling, the bulldozing blade continues to push the soil without unloading: click the "SET H"...
  • Page 5 1. Base station selection: a. First check the RTK status, if it is displayed as "single", then select the base station; b. SIGNAL -- CORS -- Log in to your CROS account. c. After connecting to the base station, check whether the RTK status is "Fixed", and the reference display is a digital non-text prompt;...
  • Page 6 3. Set base height (horizontal mode): a. Manually adjust the bulldozing blade to a position 5~10cm away from the ground; b. MODE -- LEVEL -- H Lock -- SURE C. MODE -- LEVEL -- H System -- SURE...
  • Page 7 4. Slope mode (Two-point mode -- Heading mode -- Double mode) a. MODE -- SLOPE -- Two-point mode -- Collect point A -- Collect point B -- FINISH -- AUTO...
  • Page 8 b. MODE -- SLOPE -- Heading mode -- Collect point A -- Collect point B -- FINISH -- AUTO c. MODE -- SLOPE -- Double mode -- Collect point A -- Collect point B -- Collect point c -- FINISH -- AUTO...
  • Page 9 5. SET T The bulldozing shovel cannot continue to push the soil during leveling: click the "Baseline Setting" - "↓" icon to set the base level down by 3~5cm; When leveling, the bulldozing blade continues to push the soil without unloading: click the "Baseline Setting"...
  • Page 10 7. Driving status(SYSTEM--Other--Tick”display driving status”),real-time display of driving status. 8. Localization map (After the job is completed, start the software again to load the last job track). 9. ALL display track (After the job is completed, start the software again to load the last job track)