Leading Edge SAFETY BULL Instruction Manual

Mobile fall protection system anchorage unit

Advertisement

Quick Links

US
DK
DE
PL
SE
NO
FI
CZ
EL
ES
FR
IT
NL
Instruction Manual
RO
RU
Mobile Fall Protection System Anchorage Unit
SK
Type-examination according to PPE Regulation (EU) 2016/425 performed by:
FORCE Certification A/S 0200, DK-2605 Brøndby, Denmark.
SR
*WARNING*
TR
Serious injury or death may result if this product is used for purposes other than designed. The
manufacturer provides the following instructions for the use and care of this equipment. It is
the responsibility of the purchaser to understand and convey explicit instruction to each user.
Safety Bull™ Manufacturing/Safety Bull™ complies with the requirements of EN795:2012 when
set up and used according to the manufacturers' instructions.
Safety Bull™ – 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SAFETY BULL and is the answer not in the manual?

Questions and answers

Summary of Contents for Leading Edge SAFETY BULL

  • Page 1 It is the responsibility of the purchaser to understand and convey explicit instruction to each user. Safety Bull™ Manufacturing/Safety Bull™ complies with the requirements of EN795:2012 when set up and used according to the manufacturers’ instructions. Safety Bull™ – 1...
  • Page 2 Inspection Item Noted: Corrective Action Needed? Maintenance Performed: Overall Cart Parts Approved By: Welded Connection Approved By: Safety Lifeline Tie-off Rings and Hoisting D-Rings Approved By: Cables Approved By: Fall indicator Approved By: Overall Cart Corrosion Approved By: 2 – Safety Bull™...
  • Page 3 6. Datum van inspectie kolicima 5. Ημερομηνία αγοράς 10. Wszystkie części wózka 6. Ημερομηνία επιθεώρησης 7. Inspectiepunt genoteerd 1. TR – SAFETY BULL DENETİM VE BAKIM 11. Zatwierdzone przez 8. Corrigerende maatregel nodig 7. Σημειώθηκε στοιχείο επιθεώ- GÜNLÜĞÜ 12. Połączenie spawane ρησης...
  • Page 4: Inspection Log

    Name and signa- (routine examination age, maintenance ture of the examiner/ Date or maintenance) work carried out etc. expert Next inspection According to DGUV Rule 112-198 the installation documentation needs to be stored for future references. 4 – Safety Bull™...
  • Page 5 В соответствии с Правилом 112-198 ningsman/sakkunnig person la instalación debe conservarse para DGUV, документация по монтажу 11. Nästa kontroll consultas posteriores. должна храниться для дальней- Enligt DGUV-regel 112-198 måste instal- lationsunderlagen sparas för framtida шего использования. referens. Safety Bull™ – 5...
  • Page 6: Assembly Manual

    Assembly manual: 16mm | 5/8” 20Nm | 15lbf ft 6 – Safety Bull™...
  • Page 7 Safety Bull™ – 7...
  • Page 8 8 – Safety Bull™...
  • Page 9   Safety Bull™ – 9...
  • Page 10: Diagram Of Parts

    Locking Mechanism Add-on Add-on Job Box Material Rack Hoisting Guide-Rings Add-on Side bars Front axle lock Handle Fall indicator Fall Arrest Attachment Brake Rings, 1-2 Persons (1 person per ring) KEEP BRAKE LOCKED UNLESS MOVING CART 10 – Safety Bull™...
  • Page 11: Safety Guidelines

    ASSEMBLY 4.5 The anchorage system may only be used Refer to the manual’s first pages for assem- by appropriately instructed and trained bly instructions for Safety Bull. personnel. 4.6 An emergency rescue plan must be in place APPLICATIONS to cover all possible emergency situations Safety Bull™...
  • Page 12 EXAMPLE 2 4.24 The anchoring device is not to be used for the positioning or abseiling of people or loads. Should such use be considered, ≥ 2,5 m please consult Safety Bull™ first. 12 – Safety Bull™...
  • Page 13: Compatible Equipment

    Should a device be subjected to stress (in PPE components is used, care should be the case of a fall), all warranty rights relating taken to ensure that the functionality of each to those components specifically designed Safety Bull™ – 13...
  • Page 14: Sample Label

    9.3 Max load on construction 6kn and Max dis- deformed and need replacing, shall expire. placement of safetybull 60cm in case of fall. 9.4 DO NOT USE SAFETY BULL™ SYSTEM ON SAMPLE LABEL THE FOLLOWING SURFACES: • Metal Deck less than 0.65 mm or above 0.8 mm.
  • Page 15: Making Connections

    Edge and a maximum of 20 metres from find your local dealer. the leading edge with a maximum of a 30 12.2 DO NOT hook lifeline to any point except a metre work zone at the leading edge.) Attachment Tie-off Rings.
  • Page 16: Maintenance, Care, And Storage

    Do not exposure SafetyBull to before hoisting Safety Bull™. fumes, corrosive elements and environmen- 15.8 Safety Bull™ was designed to be hoisted by tal effects. Dried by natural ventilation a crane with the use of a four-leg wire rope 16 – Safety Bull™...
  • Page 17 Safety Bull™ may also be lifted by a forklift using the desig- nated Fork Pockets. Refer to the following illustration for proper hoisting: HOISTING DIAGRAM Lifting Sling Fork Pockets Safety Bull™ – 17...

Table of Contents