Download Print this page

Sealey SC03 Manual page 3

2 shelf 2 door floor cabinet

Advertisement

4.6.
BASE OUTER FASCIA ASSEMBLY (Step 6)
4.6.1. Fit the base outer fascia (E) over the cross member
(C) with the hinge pivot holes facing upwards. Tap the
base outer fascia down with a rubber hammer until the
indents in the sides of the fascia clip into the matching
holes on the cross member (C).
4.6.2. Insert a hinge pivot moulding (K) at each end of the
upper face of the base outer fascia (E). Insert the
other two hinge pivot mouldings at each end of the
downward facing edge of the cabinet top.
4.6.3. Insert a locking rod recess moulding (L) into the
centrally placed holes in the same faces used for
mounting the hinge pivot mouldings at both the top
and the bottom.
4.7.
SHELF ASSEMBLY (Step 7)
4.7.1. Insert shelf stops (S) at the desired height for each
shelf and lay the shelves onto the stops.
ENVIRONMENT PROTECTION
Recycle unwanted materials instead of disposing of them as waste. All tools, accessories and packaging should be
sorted, taken to a recycling centre and disposed of in a manner which is compatible with the environment. When
the product becomes completely unserviceable and requires disposal, drain any fluids (if applicable) into approved
containers and dispose of the product and fluids according to local regulations.
NOTE: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts
without prior notice.
IMPORTANT: No Liability is accepted for incorrect use of this product.
WARRANTY: Guarantee is 12 months from purchase date, proof of which is required for any claim.
Sealey Group, Kempson Way, Suffolk Business Park, Bury St Edmunds, Suffolk. IP32 7AR
01284 757500
© Jack Sealey Limited
4.8.
DOORS ASSEMBLY (Step 8)
4.8.1. Mount each door in turn by placing it between the upper and
lower hinge pivot mouldings. Align the upper hole in the door edge
with the hole in the upper pivot moulding and insert a hinge pin
upwards through the door and into the moulding. Rotate the short
arm of the pin around onto the inner face of the door as shown
above and bend over the metal tab to retain it. Mount the lower
hinge pin in the same way. Repeat the process to mount the other
door.
4.8.2. Fit the rubber door stops (Q) as shown in Step 8 to the corners of
each door.
4.9.
Using a mild solution of detergent and water and wipe the unit
down with a soft cloth.
sales@sealey.co.uk
Original Language Version
www.sealey.co.uk
SC03
Issue 2 (ALL)
17/10/23

Advertisement

loading