Download Print this page

LG 55EC940V Service Manual page 18

Oled tv

Advertisement

(5) Enter Test : Press Enter KEY OF SET
- Don't need to run a test with this sequence. For example,
the sequence such as 'Right → Up → Down → Left → Enter'
is allowed.
12. HDMI ARC Function Inspection
12.1. Test equipment
- Optic Receiver Speaker
- MSHG-600 (SW: 1220 ↑)
- HDMI Cable (for 1.4 version)
12.2. Test method
(1) Insert the HDMI Cable to the HDMI ARC port from the
master equipment (HDMI1)
(2) Check the sound from the TV Set
(3) Check the Sound from the Speaker or using AV & Optic
TEST program (It's connected to MSHG-600)
* Remark: Inspect in Power Only Mode and check SW version
in master equipment
Copyright ©
LG Electronics. Inc. All rights reserved.
Only for training and service purposes
13. AUDIO output check
13.1. AUDIO output check
(1) RF input: Mono, 1 KHz sine wave signal, 100 % Modulation
(2) CVBS, Component: 1 KHz sine wave signal (0.5 Vrms)
13.2. Specification
Item
Min
Audio practical
9.0
max Output, L/R
(Distortion=10%
8.5
max Output)
13.3. Audio Output Inspection
- Input "Check-S KEY" of adjust remote controller to inspect
speaker
(1) When you click the first, the output volume of left &right
main speakers must be 50.
(2) When you click the second, the output volume of left &right
main speakers must be 80.
(3) When you click the third, the output volume of left &right
main speakers must be 100.
(4) When you click the fourth, the output volume of left main
speaker must be 50.
(5) When you click the fifth, the output volume of right main
speaker must be 50.
14. GND and HI-POT Test
14.1. GND & HI-POT auto-check preparation
- Check the POWER cable and SIGNAL cable insertion
condition
14.2. GND & HI-POT auto-check
(1) Pallet moves in the station. (POWER CORD / AV CORD is
tightly inserted)
(2) Connect the AV JACK Tester.
(3) Controller (GWS103-4) on.
(4) GND Test (Auto)
- If Test is failed, Buzzer operates.
- If Test is passed, execute next process (Hi-pot test).
(Remove A/V CORD from A/V JACK BOX)
(5) HI-POT test (Auto)
- If Test is failed, Buzzer operates.
- If Test is passed, GOOD Lamp on and move to next
process automatically.
14.3. Checkpoint
(1) Test voltage
- GND: 1.5 KV/min at 100 mA
- SIGNAL: 3 KV/min at 100 mA
(2) TEST time: 1 second
(3) TEST POINT
- GND Test = POWER CORD GND and SIGNAL CABLE
GND.
- Hi-pot Test = POWER CORD GND and LIVE &
NEUTRAL.
(4) LEAKAGE CURRENT: At 0.5 mArms
- 18 -
Typ
Max
Unit
Remark
10.0
12.0
W
- Condition: EQ/AVL/Clear
Voice Off
- Speaker (8Ω Impedance)
8.9
9.9
Vrms
LGE Internal Use Only

Advertisement

loading

This manual is also suitable for:

55ec930v55ec930v-za55ec940v-zb