IMPORTANT
IMPORTANT
•
•
•
Use of Air Handler During Construction
DO NOT USE THE UNIT FOR CONSTRUCTION HEAT
UNLESS ALL OF THE FOLLOWING CRITERIA ARE
MET:
•
•
•
Page 4 of 22
•
•
ADHERED TO.
Installation Clearances
Non-Ducted Return Closet Installation
single-story buildings.
When a
•
•
•
determine if the open area meets the minimum open area
listed above.
Installation
Issue 2336
GEA
507787G02 / 31-5000675-1