CONNECTION INSTRUCTIONS
STEP 11
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Once the completed prep table is in its' desired location use the threaded posts of the casters (8, 16) to level
the table and lock nuts with the double-ended open wrench (BB) to hold the adjusted position.
14