4.1 Preparations before installation

4.1.1 Space requirements
Refer to 3.3 for the dimensions of the lift. There must also be a clearance of at least 1 meter (about 39") between the lifting platform and
fixed elements (e.g. wall) in all lifting positions. There must be sufficient space at the ends of the lifting platform for driving vehicles on and
off.
To stop vehicles colliding with the ceiling, it is advisable to fit an overhead light barrier in low ceiling buildings.
4.1.2 Foundations and connections
The user must have the following work performed before erecting the lift.
Construction of the foundation following consultation with the manufacturer's customer service or an authorized service agent.
Routing of the wiring to the installation location. Refer also to the corresponding information on the name plate and in the operation
instructions. Before doing electrical connection, make sure the lift is electrically adapt to the local power supply.
The user must provide fuse protection for the connection. Requirements for power supply cable of the installation site: at least
2
2.5mm
(1/8 sq. inch)wire core for 3Ph power and 4.0mm
Attention: electrical system connection must be done by licensed technicians.
4.1.3 Tools and equipment needed for installation
Tool name
Open spanner
Adjustable spanner
Cross socket screw driver
Lift device
Socket spanner
Installation, Operation and Parts Manual
2
(3/16 sq. inch)wire core for 1Ph power.
Specification
D17-19
bigger than D30
PH2
Capacity more than 1100 lbs.
D6
9
MJ-TS6600
Qty
2
1
1
1
1

Advertisement

Table of Contents
loading

Table of Contents