Download Print this page

Zaer ZR820302 Assembly Instructions page 2

Iron garden swing bench

Advertisement

Step 1: Fix top panel (N ) on bottom panel (M) for both sides,
keep nail hole on bottom panel (M) toward outside.
J (6 PCS)
keep this way
Step 3: Fix left and right arms (B) to seat and back (A) ,
fix chain (C) to arm (B),keep longer one in front.
IMPORTANT: Check all hardware for tightness before and during use
Safe for both indoor and outdoor use; year round
Seats up to two (2) people; approx. 600lbs
Clean with damp/dry cloth; use clear protective overspray (ex. Rustoleum) for
added protection against potential fading and/or weatherization
Visit www.ZaerLTD.com to shop our entire selection of wholesale home & garden decor
no this way
not this way
The assembly requires 2 people and will take approximately 20 minutes
STEPS
Step 2:
Fix bar (D) on top and bar (E) on back to the frame.
Step 4:
Hang hook (F) on the top frame,hang chain (C) and seat (A)
onto the hook (F);Fix nail (K)x4 to ground.
Use and Care:
Zaer Ltd. products have a 30 day warranty that begins once product
is delivered. Questions/Comments: Call 215-766-2010 or email
H (4 PCS)
F (2 PCS)
K
Zaer Ltd. International Warranty
sales@zaerltd.com.
G (4 PCS)
I (14 PCS)

Advertisement

loading