Page 1
ZAER LTD. INTERNATIONAL ASSEMBLY INSTRUCTIONS ITEM NO.: ZR200777 12.5 ft. Long LG Iron Christmas Train with Cart and Lanterns "The North Pole Express" Please read instructions thoroughly before assembling this product. Familiarize yourself with inventory of parts and the accompanying illustrations to ensure safe and proper assembly.
215.766.2010 ZAER LTD. INTERNATIONAL ASSEMBLY INSTRUCTIONS ITEM NO.: ZR200777 Please read instructions thoroughly before assembling this product. Familiarize yourself with inventory of parts and the accompanying illustrations to ensure safe and proper assembly. PARTS LIST Description Description Part Picture...
Page 3
215.766.2010 ZAER LTD. INTERNATIONAL ASSEMBLY INSTRUCTIONS ITEM NO.: ZR200777 STEP 1: Locate and connect the Bottom Parts (A1/B2/C3/D4/E5) with corresponding Nuts (I8) and Screws (N4). www.ZAERLTD.com PG 3...
Page 4
215.766.2010 ZAER LTD. INTERNATIONAL ASSEMBLY INSTRUCTIONS ITEM NO.: ZR200777 STEP 2: Insert Axles (F6/G7) to the Bottom Part created in previous step. Locate the six (6) Small Wheels (H8) and lock them to Axles (F6/G7) with corresponding Nuts (K1). R8 J9 STEP 3: Lock Support for Foot Step (K2) to Foot Step (J1) with Nuts (J9) and Spacer (R8).
Page 5
ZAER LTD. INTERNATIONAL ASSEMBLY INSTRUCTIONS ITEM NO.: ZR200777 STEP 4: Locate and assemble the Carriage Side Walls (U3/V4/X6/Y7) and secure the Carriage Top (T2) to the assembled Side Walls (U3/V4/X6/Y7) using Nuts (L2). Then attach and lock the Window Covers (W5) with Nuts (M3).
Page 6
ZAER LTD. INTERNATIONAL ASSEMBLY INSTRUCTIONS ITEM NO.: ZR200777 STEP 5: Locate Cart Walls (P7/Q8/R9/S1) and assemble the cart as shown above. STEP 6: Locate Boiler Parts (A9/B1/C2/Z8) and assemble as shown with Nuts(I9/L2). Combine the Boiler Part 1 (D3) and Boiler Part 2 (E4).
Page 7
ZAER LTD. INTERNATIONAL ASSEMBLY INSTRUCTIONS ITEM NO.: ZR200777 STEP 7: Secure the Boiler Parts (D3/E4) from STEP 6 with Screws (Q7). Locate Pipe (F5) and attach to the Boiler with Nuts (L2). Then attach the assembled Boiler to the Bottom (from STEP 3) with Screws (N4).
Page 8
ZAER LTD. INTERNATIONAL ASSEMBLY INSTRUCTIONS ITEM NO.: ZR200777 STEP 8: Locate and assemble the Supports (H7) to the front of the Boiler from previous step with Nuts (O5) and Screws (K1). Locate Lanterns (G6) and secure them to the Carriage (from STEP 4) with Nuts(Q7). Attach the Cart (STEP 5) and Carriage (STEP 4) to the assembled Bottom Part (STEP 3) with Nuts (P6).
Page 9
Visit www.ZaerLTD.com to shop our entire selection of wholesale home & garden decor! *Not a retailer/wholesale buyer? Head over to www.Lesera.com for Zaer Ltd. products available direct to consumer! Follow both Zaer Ltd. (Wholesale) and Lesera (Retail) on Social Media: Zaer Ltd.