Installation - HADEF DIN 7355 Installation, Operating And Maintenance Instructions

Steel jack
Table of Contents

Advertisement

Installation

6
Installation
Pos: 11.2.1.1 /6--MONTAGE/Winde + Seilzug/Allgemein/01.Allgemein - Alle @ 0\mod_1175003277025_52.doc @ 2819 @ @ 1
Please observe the following points in order to avoid any damage to equipment or injury of person:
Wear safety gloves.
Install the winch on a stable ground.
Make sure attachment surface is flat and that installation is made stress-free, - use shim parts if
necessary.
The winch must be set up and attached in such a way that it cannot change position neither by the load
nor by other influences.
Pos: 11.2.2 /6--MONTAGE/Winde + Seilzug/7355/7355 - Zusatz @ 1\mod_1266822219840_52.doc @ 12670 @ @ 1
The load must only be lifted with the head or the lifting claw of the device.
The load must always contact the surface of the winch feet right-angled (90°).
CAUTION!
Do not push inclined as this may lead to accidents, this is not allowed.
Pos: 12.1 /7--BEDIENUNG/*Ü1*/#. Kapitel - Bedienung @ 0\mod_1172647408811_52.doc @ 398 @ @ 1
5.52.210.00.01.01
11

Advertisement

Table of Contents
loading

Table of Contents