Lennox EL195UHNE Installation Instructions Manual page 9

Hide thumbs Also See for EL195UHNE:
Table of Contents

Advertisement

SETTING EQUIPMENT
UPFLOW APPLICATION
Place level on blower
Place level on the front blower
deck screws to check
deck to check side to side
forward tilt
UNIT
FRONT
AIR FLOW
1/2"
max.
SIDE VIEW
HORIZONTAL APPLICATION
UNIT
FRONT
AIR FLOW
1/2"
max.
END VIEW
FRONT VIEW
Unit must be level side-to-side. Unit may be positioned from level to 1/2" toward the front to aid in draining.
FIGURE 11
Page 9

Advertisement

Table of Contents
loading

Table of Contents