INSPECT SHIPMENT carefully for any signs of
A.
damage.
1. ALL EQUIPMENT is carefully manufactured, in-
spected and packed. Our responsibility ceases upon
delivery of boiler to the carrier in good condition.
2. ANY CLAIMS for damage or shortage in shipment
must be filed immediately against the carrier by the
consignee. No claims for variances from, or short-
age in orders, will be allowed by the manufacturer
unless presented within sixty (60) days after the
receipt of goods.
B.
LOCATE THE UNIT
1. RECOMMENDED SERVICE CLEARANCE
— Locate the unit in the boiler room so as to
provide ease of venting and adequate clearance
for maintenance, serviceability, and installation of
piping. Refer to Figure 1 for boiler dimensional
data.
FRONT — Provide 43" service clearance for
removal, maintenance, and servicing of burner and
controls.
REAR — Provide a minimum clearance from the
boiler jacket for access to flame observation port,
rear flue damper and vent piping, relief valve, and
boiler return piping. See Table III.
LEFT SIDE — Provide a minimum clearance from
the boiler jacket of 26" for cleaning of flueways and
installation and removal of tankless heater(s).
RIGHT SIDE — Provide a minimum clearance from
the boiler jacket of 12".
TOP — Provide a minimum clearance from the
boiler jacket of 24".
Recommended clearance for service may be reduced
to minimum clearance to combustible material.
However, increased service and maintenance difficulty
will result.
Le dégagement recommandé pour l'entretien peut
être réduit à un dégagement minimum par rapport aux
matériaux combustibles. Cependant, il en résultera
une augmentation des difficultés de service et de
maintenance.
Use appropriate equipment to move and place heavy
components.
Utiliser l'équipement approprié pour déplacer et placer
les composants lourds.
This boiler is NOT suitable for installation on com-
bustible floor.
Floor construction should have adequate load
bearing characteristics to bear the weight of
the boiler filled with water (see Table 1). A boiler
foundation similar to the one shown in Figure 2 is
recommended if the boiler room floor is weak or
uneven or if a water condition exists.
Cette chaudière ne convient PAS pour une instal-
lation sur un sol combustible.
La construction du plancher doit avoir des
caractéristiques de portance adéquates pour
supporter le poids de la chaudière remplie
d'eau (voir le tableau 1). Une fondation de
chaudière similaire à celle illustrée à la figure 2 est
recommandée si le plancher de la chaufferie est
faible ou irrégulier ou s'il y a une condition d'eau.
2. FOR MINIMUM CLEARANCES to combustible
materials, See Table II.
3. PROVIDE ADEQUATE FOUNDATION for the
unit. Refer to Figure 2.
Table II: Minimum Clearances To Combustible
Materials (Inches)
Boilers with Top Flue Outlet
Boilers with Rear Flue Outlet
A
B
C
Above
Front
Rear
6
24
6
D
E
Sides
Vent Connector
18
6
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

V903aV904aV905aV906aV907aV908a ... Show all

Table of Contents