DAISHIN PTD Series Manual

Diesel engine pump

Advertisement

Quick Links

PTD Series
206/206S/306/306S/406/406S
206T/206TS/306T/306TS/405T/405TS
PTD Diesel Engine Pump
FHG DY Pump

Advertisement

Table of Contents
loading

Summary of Contents for DAISHIN PTD Series

  • Page 1 PTD Series 206/206S/306/306S/406/406S 206T/206TS/306T/306TS/405T/405TS PTD Diesel Engine Pump FHG DY Pump...
  • Page 2 1 -A 2 -A 3 -A...
  • Page 3: Table Of Contents

    FOREWORD Thank you very much for purchasing FHG DIESEL PUMP. This manual covers the operation and maintenance of this FHG DIESEL PUMP. Please take a moment to familiarize yourself with the proper operation and maintenance procedures in order to maximize the safe and efficient use of this product. Keep this owner’s manual at hand, so that you can refer to it at any time.
  • Page 4: Safety Precautions

    1. SAFETY PRECAUTIONS Please make sure you review each precaution carefully. Pay special attention to the following statements. “WARNING” indicates a strong possibility of severe personal injury or WARNING loss of life, if instructions are not followed. “CAUTION” indicates a possibility of personal injury or equipment CAUTION damage, if instructions are not followed.
  • Page 5  Keep the pump away from flammables and other hazardous materials (trash, rags, lubricants, explosives). : OTHER SAFETY PRECAUSIONS WARNING  Be careful of hot parts.  The muffler and other engine parts become very hot when the pump is running or just after it has stopped. Operate the pump in a safe area and keep children away from the running pump.
  • Page 6: Label

    2. LABEL 3. COMPONENTS NOTE Please refer to the illustrations on the back page of the front cover or back cover for Fig. 1 to 6 . indicated in the sentence. (See Fig. 1 -A) ① Plug (Drain) ⑧ Fuel tank ②...
  • Page 7: Pre-Operation For Starting

    4. PRE-OPERATION FOR STARTING Recommended engine oil Air discharge from fuel line Air discharge from the fuel line is required Use diesel engine oil of class “CC” or “CD” only when starting the engine under following (API ranking) according to the table below: conditions: Temperature Viscosity grade...
  • Page 8: Operating Your Pump

    2. CHECK PRIMING WATER 3. CHECK AIR CLEANER (See Fig. 2 -C) (See Fig. 6 ) It is required that the water chamber of the Check the air cleaner condition. pump casing is sufficiently primed with water If oil is lacking or contaminated, add engine before operating the pump.
  • Page 9 - IDLE 5. BATTERY b) Close the fuel valve. (See Fig. 4 -A) Check the battery electrolyte level every month. Refill the distilled water until the upper - CLOSE limits if the electrolyte dropped to the lower limits. 4. ELECTRIC STARTER CAUTION a) Open the fuel valve.
  • Page 10: How To" Maintenance

    “HOW-TO” MAINTENANCE 1. DAILY INSPECTION 2. PERIODIC INSPECTION Before running the engine, check the Periodic maintenance is vital to the safe and following service items. efficient operation of your product. 1. Check priming water Check the table below for periodic 2.
  • Page 11 CAUTION * Note 2 After the procedures of these items, please ■ Do not use gasoline engine oil. Use diesel engine oil only. refer to the SERVICE MANUAL or consult your nearest FHG service dealer. 4. SERVICING THE AIR CLEANER 3.
  • Page 12: Preparations For Storage

     Turn the knob counterclockwise and open  Clean the inside of the pump casing and the casing cover holder. casing cover with clean water.  Pull the casing toward you, and then remove the casing and the inner casing. PREPARATIONS FOR STORAGE 1.
  • Page 13: Easy Troubleshooting

    EASY TROUBLESHOOTING 1. PUMP DOES NOT RUN 4. WHEN ENGINE DOES NOT START:  Stucking of impeller (Disassemble and clean.)  Perform the following checkup before you take the pump to your FHG dealer. 2. PUMPING VOLUME IS LOW  If you still have trouble after completing ...
  • Page 14: Pump Specifications

    PUMP SPECIFICTION...
  • Page 15: Engine Specifications

    ENGINE SPECIFICATIONS MODEL DY25P DY30P DY41P DY46P Single cylinder, 4 stroke, vertical, TYPE air cooled, diesel engine Cumbustion System Direct injection combution Bore x Stroke (mm) 73 x 59 78 x 62 86 x 70 88 x 75 Piston Displacement (L) 0.247 0.296 0.406...
  • Page 16 4 -A 7 -A OPEN STOP IDLE CLOSE DOWN START 5 -A...
  • Page 17 APPENDIX A Battery enclosure kit assembly and installation instructions for electric starter type. Ref. Parts No. Description. Ref. 1530 2531 010 BATT.FRAME 1530 2551 010 BATT.PLATE 1530 2552 010 BATT.PROTECTION PLATE 1555 0184 000 U BOLT 1555 0489 000 BATT.SETTING BOLT 1530 1551 001 BATT.SETTING PLATE 1555 0250 000...
  • Page 18 1520-1, Funatsuke, Yoro-cho, Yoro-gun, Gifu 503-1382, Japan Phone: +81-584-36-0501 Fax: +81-584-36-0504 URL http: //www.daishin-japan.co.jp E-mail: overseas@daishin-japan.co.jp P/No. 205002263.

Table of Contents