Download Print this page

Lefroy Brooks ARCHIPELAGO CB-4071 Installation, Operating, & Maintenance Instructions

Pressure balance mixing valve trim only

Advertisement

Quick Links

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS
CB-4071
BLACK LEVER ARCHIPELAGO PRESSURE BALANCE MIXING VALVE TRIM ONLY,
TO SUIT M1-4100 ROUGH

Advertisement

loading

Summary of Contents for Lefroy Brooks ARCHIPELAGO CB-4071

  • Page 1 INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS CB-4071 BLACK LEVER ARCHIPELAGO PRESSURE BALANCE MIXING VALVE TRIM ONLY, TO SUIT M1-4100 ROUGH...
  • Page 2: Table Of Contents

    Contents Dimensions Instal ation Procedure Parts List Fault Finder Safety Tips, Care and Maintenance Guarantee...
  • Page 3: Dimensions

    Dimensions in Inches (& Millimetres) 2 3/16" (55mm) W3/16-24 1 7/8" (47mm) 3 7/16" (88mm) Whilst every effort is made to ensure accuracy, design and dimensions are subject to change without notice as part of the company’s product development process.
  • Page 4: Instal Ation Procedure

    Installation Procedure Steps 1-2 Lefroy Brooks always recommends that plumbing products be installed by a licensed professional. Shut off main water supply before installation. mixed water out 82~107mm Note: Plaster guard Keep a distance of HOT WATER - IN 7mm at least from...
  • Page 5 Installation Procedure Steps 3-5 Lefroy Brooks always recommends that plumbing products be installed by a licensed professional. Shut off main water supply before installation. Stopper A (marked #049000) Stopper B (marked #049001) Washer C Cut a hole on the wall surface for fitting the trim kit. The hole dimension is as shown in figure 3.
  • Page 6 Installation Procedure Steps 9-11 Lefroy Brooks always recommends that plumbing products be installed by a licensed professional. Shut off main water supply before installation. Stopper A Stopper B (marked #049000) (marked #049001) 12 teeth 0 tooth LOW TEMPERATURE SETTING (with 60° operation range) HIGHT TEMPERATURE SETTING (with 150°...
  • Page 7 Installation Procedure Steps 12-13 Lefroy Brooks always recommends that plumbing products be installed by a licensed professional. Shut off main water supply before installation. Position valve into the wall as shown. Install handle.
  • Page 8: Parts List

    Parts List Exploded view Seal (013007) Canopy (018251) Screw head (008291) Front plate (006225) Screw (008109) Handle stem (017094) Screw (008101) Canopy (205003) Handle sleeve (108924) Adjusting ring (104292) Set screw (075018) Handle-end cap (109376) Canopy (071227) Handle head (205002) Allen key (031003) Set screw (065086) Handle adaptor (109377)
  • Page 9: Fault Finder

    Fault Finder Fault Cause Rectification Wobbling of handle. The fixing screw comes loose. Check for fixing screw and re-tighten it properly. Wobbling of canopy. The canopy comes loose. Check and tighten the canopy.
  • Page 10: Safety Tips, Care And Maintenance

    Safety Tips, Care and Maintenance Safety Tips If you are soldering during faucet installation,remove cartridges, seats, gaskets and washers prior to applying flame, otherwise you will void the warranty. Cover drain openings to avoid losing small parts. When cutting or soldering pipe, use safety glasses to protect your eyes. Important Points Prior to beginning installation.
  • Page 11: Guarantee

    Not Covered by this Guarantee Damage or defects arising from incorrect installation, improper use or lack of maintenance. Installed product damaged in transit Consequential loss, damage or product removal and installation costs. Lefroy Brooks is not responsible for any on site labour charges.
  • Page 12 TELEPHONE: 718-302-5292. FAX: 718-302-4177 The use of trademarks, product design and artwork is subject to licence or agreement with Christo A. Lefroy Brooks. The design registrations, trademark registrations and copyrights are protected by law and the use or reproduction outside the terms of an agreement is prohibited.