Pentair STA-RITE SL Series Installation, Operation & Parts page 7

Convertible deep well jet pumps
Table of Contents

Advertisement

Available languages

Available languages

Electrical
Hazardous voltage. Can shock, burn, or kill.
Connect ground wire before connecting power supply
wires. Use the wire size (including the ground wire) speci­
fied in the wiring chart. If possible, connect the pump to a
separate branch circuit with no other appliances on it.
Explosion hazard. Do not ground to a gas sup­
ply line.
WIRING CONNECTIONS
Fire hazard. Incorrect voltage can cause a
fire or seriously damage the motor and voids the warranty.
The supply voltage must be within ±10% of the motor
nameplate voltage.
NOTICE: Dual-voltage motors are factory wired for 230
volts. If necessary, reconnect the motor for 115 volts, as
shown. Do not alter the wiring in single voltage motors.
Install, ground, wire, and maintain your pump in com-
pliance with the National Electrical Code (NEC) or the
Canadian Electrical Code (CEC), as applicable, and with
all local codes and ordinances that apply. Consult your
local building inspector for code information.
Table I: Wiring Chart – Recommended Wire and Fuse Sizes
115Volts:
SLC
HLC
SLD
HLD
SLE
HLE
SLF
230 Volts:
SLC
HLC
SLD
HLD
SLE
HLE
SLF
For parts or assistance, call Flotec Customer Service at
Branch
Max
Fuse
Load
Rating
Model
HP
Amps
Amps
1/2
9.9
15
1/2
12.4
20
3/4
12.4
20
3/4
14.8
20
1
14.8
20
1
19.9
25
1-1/2 19.9
25
1/2
4.9
15
1/2
6.2
15
3/4
6.2
15
3/4
7.4
15
1
7.4
15
1
9.9
15
1-1/2
9.9
15
Connection Procedure:
Step 1. Connect the ground wire as shown in Figure 11.
The ground wire must be a solid copper wire at
least as large as the power supply wires.
Step 2. There must be a solid metal connection between
the pressure switch and the motor for motor
grounding protection. If the pressure switch is
not connected to the motor, connect the green
ground screw in the switch to the green ground
screw under the motor end cover. Use a solid
copper wire at least as large as the power supply
wires.
Step 3. Connect the ground wire to a grounded lead in
a service panel, to a metal underground water
pipe, to a metal well casing at least ten feet (3M)
long, or to a ground electrode provided by the
power company or the hydro authority.
Step 4. Connect the power supply wires to the pressure
switch as shown in Figure 11.
Distance in Feet (Meters);
Wire Size AWG (mm
0­100
101­200 201­300 301­400 401­500
(0­30)
(31­61)
(62­91)
(92­122) (123­152)
14(2)
10(5.5)
8(8.4)
12(3)
10(5.5)
8(8.4)
12(3)
10(5.5)
8(8.4)
12(3)
8(8.4)
6(14)
12(3)
8(8.4)
6(14)
10(5.5)
8(8.4)
6(14)
10(5.5)
8(8.4)
6(14)
14(2)
14(2)
14(2)
14(2)
14(2)
14(2)
14(2)
14(2)
14(2)
14(2)
14(2)
14(2)
14(2)
14(2)
14(2)
14(2)
14(2)
12(3)
14(2)
14(2)
12(3)
1-800-365-6832
)
2
8(8.4)
6(14)
6(14)
6(14)
6(14)
6(14)
6(14)
4(21)
6(14)
4(21)
4(21)
4(21)
4(21)
4(21)
14(2)
12(3)
12(3)
12(3)
12(3)
12(3)
12(3)
10(5.5)
12(3)
10(5.5)
10(5.5)
10(5.5)
10(5.5)
10(5.5)
7

Advertisement

Table of Contents
loading

Table of Contents