Installation, Operation & Maintenance Manual Scissor Alignment Lift Model SX14 & SX14R 14,000 lbs. Capacity 7,000 UNWAY 2311 South Park Rd Louisville, Kentucky 40219 Email:sales@challengerlifts.com site:www.challengerlifts.com Office: 800-648-5438 / 502-625-0700 Fax: 502-587-1933 IMPORTANT: READ THIS MANUAL COMPLETELY BEFORE INSTALLING or OPERATING LIFT Rev.
Page 2
Symbols used in the Manual The signage (ISO) indicated below is used within this manual to focus attention on those operations that must be performed carefully in order to guarantee safety during installation. Indicates that, when performing the operation, GENERAL great care must be taken to prevent the onset of DANGER events that could cause serious injury or damage.
Do this for your own protection. LOORING Challenger Lifts NOTIFY AT ONCE if any Be certain you have the proper concrete floor hidden loss or damage is discovered after receipt.
Page 17
Layout the service bay according to the Repeat for other platform assembly and architect’s plans or owners instructions (see remove any remaining banding/packaging. Fig. 1) . Failure to install in this orientation Remove all electrical/hydraulic/air lines can result in personal and property damage. from under platforms and route to the Be certain that the proper conditions exist, control console.
Page 18
Ensure power to supply wiring is OFF before making following connections. Description Line Power supply to console shall be a suitable LOCKS electrical source as shown in the Fig. 13 - ROLLING JACKS 10mm Electrical Wiring Diagram. For single phase console, connect the electrical supply to the SLIP PLATES back side of the Disconnect Switch, Refer...
Page 19
LEEDING YNCHRONIZING After adding fluid to the reservoir, turn Power on and ensure the Main Switch is turned to the “ON” position. Ensure air supply is connected and T-fitting on runway is plugged or connected to the rolling jacks with the airline kit. NOTE: The UP, DOWN, LOCK, and PHOTOCELL OVERRIDE switches are “momentary”, so the function only remains...
Page 20
With all bases properly adjusted and EVELING adequately supported with shims or grout, Ensure platforms are square with one proceed with ANCHORING. another and arranged as shown in Fig. 1 and base plates are spaced according to Once anchored, lower lift and use the Fig.
The Owner/Employer shall display the lift WNER PERATOR HECKLIST manufacturer’s operating instructions; ALI/SM 93 - Demonstrate the operation of the lift to the 1, ALI Lifting it Right safety manual; ALI/ST-90 ALI owner/operator and review correct and safe Safety Tips card; ANSI/ALI ALOIM-2008, American lifting procedures using the Lifting It Right National Standard for Automotive Lifts-Safety booklet as a guide.