JUKI PLK-J4040R Technical Manual page 23

Industrial sewing machine
Table of Contents

Advertisement

(6) Turn the hand pulley (No.6) by hand in the direction of the arrow then, move up the needle bar (No.7)
from the lowest position and stop it at the position where the needle bar timing mark C is matched to
the needle bar bushing bottom line (No.8).
NOTE If the needle class is DPx5, match the needle bar timing mark D to the needle bar bushing bottom
line (No.8).
<6>
<6>: Hand pulley <7>: Needle bar <8>: Needle bar bushing bottom line
Timing mark C: For the needle class DP×17
Timing mark D: For the needle class DP×5
(7) Turn the hook by hand and stop it at the position where the hook point (No.9) meets with the center
line of the needle (No.10).
<10>
C
<7>
<9>: Hook point
<9>
<10>: Needle
- 17 -
D
C
<8>

Advertisement

Table of Contents
loading

Table of Contents