Download Print this page
Penguin PX-HF Series Installation & Maintenance

Penguin PX-HF Series Installation & Maintenance

Extended vertical high flow, materials: a-cpvc

Advertisement

Quick Links

P E N G U I N
P E N G U I N
I n s t a l l a t i o n
&
Series PX-HF
EXTENDED VERTICAL HIGH FLOW
Penguin Pumps are designed to handle a large range of chemicals without difficulty. Completely
constructed of CPVC where in contact with the solution being pumped, Series PX pumps have an
upper working temperature of 180 degrees and thus can handle slurries, and most corrosive and
abrasive solutions. Series PX pumps are easy to install and operate, and are virtually mainte-
nance-free. All pumps have been tested for proper operation before leaving the factory. To obtain
optimum service life, please follow all installation and operating instructions.
Models:
PX-7 1/2-HF
PX-10-HF
PX-15-HF
Installation & Operating Instructions
ELECTRICAL
All models are supplied with three phase dual voltage, 208-230/460V,
50/60c motors, which are not wired at the factory. When changing from
230V wiring to 460V wiring, follow the motor manufacturer's wiring
instructions, which can generally be found either on or in the motor
junction box. Check rotation of external fan by removing splash shield,
fan spins clockwise. It is imperative that the motor rotation be checked
before operation. Attach leads to motor and bump start for a maximum
of a couple of seconds as if you were turning a light switch on/off as fast
as possible. Do not leave motor running. As viewed from the suction
entrance of the pump, check for counterclockwise rotation. If clockwise
rotation, change any two hot leads and again check rotation. Replace
fan splash shield. Many options are available on the PX Series motors
including explosion-proof, larger horsepowers to 15, and 575V motors.
If any of these options are required, please check the motors carefully
or consult the factory.
PLUMBING
The suction side piping of the pump is extremely important.
Mistakes can usually be compensated for if made on the discharge
piping. However, piping problems on the suction side can be, and
usually are, the source of ongoing problems. If a suction line
or suction extension is required, enlarge the suction line/exten-
sion by one size larger than the suction entrance. Never reduce
plumbing on the suction. Avoid 90-degree elbows and never use
a 180-degree elbow. The suction piping needs to be arranged in
such a way as to allow a straight, even flow of liquid into the eye
of the impeller. This requires that all elbows, valves, or strainers
be located at a straight and uninterrupted distance equal to at
least 5-10 times the pipe diameter. Remember, elbows create
turbulence and air entrapment. Make sure every suction coupling/
connection is airtight. The bottom of the suction extension should
always be at least 2 pipe diameters above the bottom of the tank.
In either flooded suction or non-flooded suction conditions the use
of a check valve on the discharge of the pump is recommended. In
M a i n t e n a n c e
Materials:
A - CPVC
PLUMBING CONTINUATION
the case of a non-flooded suction, a flapper check valve on the end of
the submerged suction line must be installed. To facilitate priming the
pump, install a T-connection with a small valve between the pump case
and check valve. It is advisable to use a discharge valve after the check
valve. All plumbing and accessories must be supported other than by
the pump, in order to prevent possible distortion of the pump case. The
use of some hose in the discharge plumbing close to the discharge
nozzle of the pump will absorb any movement of the solid plumbing if
vibrations exists. Also a good rule of thumb is that the source solution
tank volume should be three times the flow rate of the pump.
LIQUID LEVEL
The correct liquid level is very important. A liquid level which is too high
could cause motor damage. A liquid level that is too low, below the wear
ring, may cause severe impeller damange, THIS PUMP CANNOT RUN
DRY. CHECK THE LIQUID LEVEL. The correct liquid level is halfway
between the bung hole and the centerline of the discharge nozzle.
PRIMING
Under flooded conditions, open all the valves in the suction and
discharge lines. Wait a few minutes to let entrapped air out. Throttle the
discharge valve 2/3 closed. Leave suction valves wide open. A closed
suction or discharge valve could cause damage to the impeller and the
shaft. Start the pump and open the valve to the desired flow. Under
non-flooded conditions, fill up the pump slowly from the T-connection
and valve. See recommended installation. Then throttle the discharge
valve 2/3 closed. Start the pump and continue as flooded conditions.

Advertisement

loading

Summary of Contents for Penguin PX-HF Series

  • Page 1 Series PX-HF EXTENDED VERTICAL HIGH FLOW Penguin Pumps are designed to handle a large range of chemicals without difficulty. Completely constructed of CPVC where in contact with the solution being pumped, Series PX pumps have an upper working temperature of 180 degrees and thus can handle slurries, and most corrosive and abrasive solutions.
  • Page 2 P E N G U I N P E N G U I N I n s t a l l a t i o n & M a i n t e n a n c e RECOMMENDATIONS Always make sure there is enough liquid in the reservoir and that the level is high enough, considering the capacity of the pump unit. Inad- equate liquid will cause a vortex in the reservoir.
  • Page 3 P E N G U I N P E N G U I N I n s t a l l a t i o n & M a i n t e n a n c e PXHF-7 1/2A thru PXHF-15A - MAINTENANCE INSTRUCTIONS DISASSEMBLY 1.
  • Page 4 P E N G U I N P E N G U I N I n s t a l l a t i o n & M a i n t e n a n c e Filter Pump Industries 7932 Ajay Drive •...

This manual is also suitable for:

Px-7 1/2-hfPx-10-hfPx-15-hfPx-7 1/2ak-hfPx-10ak-hfPx-15ak-hf