In 2 Care Mosquito Station Quick Installation Manual

Advertisement

Quick Links

Quick Installation Guide
Basic training to get the best results with
the In2Care Mosquito Station.
Throughout this quick installation guide, QR codes link to videos of the corresponding steps on our
In2Care website.
How to use
www.in2care.org/how-to-use
Not Included:
Not included with the
In2Care stations are
In2Mix re ll sachets.
purchased separately.
No active ingredients included!
Personal Protective Equipment (PPE) might be required in your country / state for applicator protection during handling and
deploying pest control products. Read the full label included with the In2Mix refill sachets and check your country / state
requirements concerning the proper PPE guidance.
Evenly distribute Stations over available space
Mosquito Station
In-depth trainings
www.in2care.org/training

Recommendations

Recommended Station coverage (1 Station per 400m²/10-15 per acre)
Remove other mosquito breeding sites as much as possible. ( ower
pots, plastic cups, sewage drains, septic tanks, car tires, puddles, tree
holes etc.).
Larger water bodies should be (frequently) treated with appropriate
mosquito larvicides.
Place in shaded areas, in some cases this is close to human
habitation/house. (e.g. 1 Station near humans, 2 Stations in the yard)
In dry areas, check the water level inside the Station regularly.

Station parts:

Container
1
Marketing materials
www.in2care.org/marketing
Lid
Green time indicator cap
Floater

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Mosquito Station and is the answer not in the manual?

Questions and answers

Summary of Contents for In 2 Care Mosquito Station

  • Page 1 Mosquito Station Quick Installation Guide Basic training to get the best results with the In2Care Mosquito Station. Throughout this quick installation guide, QR codes link to videos of the corresponding steps on our In2Care website. In-depth trainings Marketing materials How to use www.in2care.org/training...
  • Page 2 Placement • Parts • Assembly • Placement • 3 minutes Attach green time indicator cap. Set to month of installation. Place Station in a shady spot. Place on a level surface. Add 5L (± 1.3 gallons) of water. In2Mix Sachet Shake well.
  • Page 3 Always keep gauze dry Gauze Installation Push down both pins rmly. Check gauze position on oater.
  • Page 4 Floater placement Gently place oater on top of the water. Secure lid (turning clockwise). Now you let the mosquitoes do the rest of the work for you! Servicing • Cleaning • Add water • New re ll sachet • 3.5 minutes Remove lid (turn counter-clockwise).

Table of Contents