Intended use governing the planning, installation, and operation of solar 4.1 Safety This manual is valid in North America for Qcells solar modules. power systems and work on roofs. These instructions contain information regarding the safe han- Any valid international, national and regional regulations ■...
1 Introduction 2 Planning 2.1 Technical specifications For additional information see the relevant datasheet of the module provided at www.qcells.com. Validity Attention! These instructions are only valid for crystalline solar modules PRODUCT LINE Q.PEAK DUO BLK ML-G10/t Q.PEAK DUO BLK ML-G10+/t from the company Qcells as specified at chapter "2.1 Technical...
Do not operate solar modules near highly flammable gas and Fig. 2: Installation options for crystalline Qcells modules. All dimensions are given in inch (mm in brackets). Also observe the maximum vapors (e.g. gas tanks, gas stations). Clamp System Recommendations test loads and clamping range as specified on the following page.
Page 5
2 Planning 2.3 Mounting options Specifications TYPE OF POINT MOUNTING SYSTEM LINEAR MOUNTING SYSTEM INSTALLATION MOUNTING POSITION OF TEST LOAD DESIGN LOAD SAFETY Installation not permitted OPTION CLAMPS* [in] PUSH / PULL** [Pa] PUSH / PULL** [Pa] FACTOR with insertion CL1a 5.11 - 13.8 (130 - 350 mm) profiles 5400 / 4000 3600 / 2660...
For detailed key electrical data, please refer to the actual data Modules may be damaged by the occurrence of reverse currents sheet referring to the relevant Module (available at www.qcells. (caused by module defects, ground leaks, or defective insulation). The loads in the table are related to the mechanical stability of the solar modules. The me- com).
Do not drop modules. Only make modifications to the module which have age to the packaging and follow their instructions. Do not install modules on moving objects. been confirmed in writing by Qcells. Follow any instructions on the packaging. confirmation letter...
3 Installation 3 Installation 3.2 Preparation of installation 3.3 Module installation Danger! Risk of fatal injury due to electric shock! Warning! Risk of injury due to falling modules! Option 1: Maintain an interval of at least 0.39 in (10 mm) be- tween two modules along the short side and 0.20 in Block o the installation zone.
4 Electrical Connection 4 Electrical Connection 4.1 Safety 4.2 Electrical installation safety Danger! Danger! Risk of fatal injury due to electric shock! Danger! Risk of fatal injury due to electric shock! Danger! Risk of fatal injury due to electric shock! Risk of fatal injury due to electric shock! Never open the junction box.
4 Electrical Connection 4 Electrical connection 4.3 Connection of modules 4.4 After installation Use solar cables for the connection at the junction Note! Module damage may occur! Ensure that all necessary safety and functional tests Note! Module damage may occur! box outlet.
Option B: Integrated grounding methods requirements on grounding. The U.S. National Electrical Code ad- The Qcells modules can be bonded with the racking system us- dresses these issues in Article 250. A module with exposed con- ing UL1703 or UL2703 certified integrated grounding methods.
8 Maintenance and cleaning NOTE! Qcells solar modules are known for a long operating life and minimal maintenance e ort and expense. Dirt and grime are Dust and dirt are abrasive materials! usually washed away by rain. If the module is fully or partially The situation for each individual project (or type of dirt) must shaded by dirt or debris (e.g., plants, bird droppings), it needs...