Qcells Q.PEAK DUO M-G11 Series Installation And Operation Manual

Qcells Q.PEAK DUO M-G11 Series Installation And Operation Manual

Hide thumbs Also See for Q.PEAK DUO M-G11 Series:

Advertisement

Installation and
operation manual
Q.PEAK DUO M-G11.X solar module series

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Q.PEAK DUO M-G11 Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Qcells Q.PEAK DUO M-G11 Series

  • Page 1 Installation and operation manual Q.PEAK DUO M-G11.X solar module series...
  • Page 2: Table Of Contents

    Table of contents 1 Introduction With solar modules from Hanwha Q CELLS GmbH (hereafter Beware of possible danger or damage. referred to as "Qcells") you can directly transform the sun’s Categories: limitless energy into environmentally-friendly solar electricity. Danger: Risk of fatal injury ■...
  • Page 3: Introduction

    1 Introduction 2 Planning 2.1 Technical specifications Validity For additional information see the relevant datasheet of the module provided at www.qcells.com. These instructions are only valid for crystalline solar modules Q.PEAK DUO M-G11 Q.PEAK DUO BLK M-G11 from the company Qcells as specified at chapter "2.1 Technical PRODUCT LINE Q.PEAK DUO M-G11+...
  • Page 4: Requirements

    Ensure that no additional forces are applied through the Fig. 2: Installation options for crystalline Qcells modules. All dimensions are given in mm. Also observe the maximum test loads and ASIA mounting system into the module except for the wind and snow clamping range as specified on the following page.
  • Page 5 2 Planning 2 Planning 2.3 Mounting options 2.3 Mounting options Specifications MOUNTING TEST LOAD DESIGN LOAD SAFETY MOUNTING REQUIREMENTS POSITION OF CLAMPS* [MM] OPTION PUSH / PULL** [Pa] PUSH / PULL** [Pa] FACTOR OPTION 100 - 450 5400 / 3600 3600 / 2400 The loads in the table are related to the mechanical stability of the solar modules. The mechanical CL1a stability of the mounting system including clamps has to be evaluated by the system supplier.
  • Page 6: Electrical Layout

    Modules may be damaged by the occurrence of reverse currents accident-prevention and safety regulations. Do not install damaged modules. sheet referring to the relevant Module (available at www.qcells. (caused by module defects, ground leaks, or defective insulation). While working wear clean gloves.
  • Page 7: Preparation Of Installation

    Do not carry out the installation alone. Do not drop modules. Only make modifications to the module which have Only use dry, insulated tools. been confirmed in writing by Qcells. confirmation letter Note! Module damage may occur! Note! Module damage may occur! Danger! Risk of fatal injury due to electric shock! Only install undamaged modules and components.
  • Page 8: Module Installation

    3 Installation 4 Electrical connection 3.3 Module installation 4.1 Safety Danger! Option 1: Maintain an interval of at least 10 mm between two Danger! Risk of fatal injury due to electric shock! Risk of fatal injury due to electric shock! modules along the short side and 5 mm along the Fasten the module with 4 clamps in the specified Never open the junction box.
  • Page 9: Electrical Installation Safety

    4 Electrical connection 4 Electrical connection 4.2 Electrical installation safety 4.3 Connection of modules Danger! Risk of fatal injury due to electric shock! Danger! Risk of fatal injury due to electric shock! Use solar cables for the connection at the junction Note! Module damage may occur! box outlet.
  • Page 10: After Installation

    Do not attempt to fix any problems yourself (e.g., glass cracks, from any water-channelling surface. damaged cables). Please contact an installer or Qcells Technical Customer Service Department. 7 Disposal Do not disconnect modules by yourself. Please contact an installer or Qcells Technical Customer Service Department.
  • Page 11: Maintenance And Cleaning

    8 Maintenance and cleaning NOTE! Qcells solar modules are known for a long operating life and minimal maintenance effort and expense. Dirt and grime are Dust and dirt are abrasive materials! usually washed away by rain. If the module is fully or partially The situation for each individual project (or type of dirt) must shaded by dirt or debris (e.g., plants, bird droppings), it needs...
  • Page 12 Hanwha Q CELLS GmbH EMAIL sales@qcells.com +49 (0)3494 66 99 – 23222 OT Thalheim Sonnenallee 17 – 21 06766 Bitterfeld-Wolfen Germany www.qcells.com +49 (0)3494 66 99 – 23000 Subject to change without notice. © Qcells Installation manual solar modules Q.PEAK_DUO_M-G11.X_modules_series_30T_2022-07_Rev04_EN...

This manual is also suitable for:

Q.peak duo m-g11+Q.peak duo blk m-g11

Table of Contents