Page 1
I N S T A L L A T I O N I N S T R U C T I O N S All-in-One System Spanish Product Description German Product Description Portuguese Product Description Italian Product Description Dutch Product Description French Product Description AN2BA Series...
IMPORTANT ! : The AN2BA Series includes the AN2BA87 and AN2BA100 mounts. These mounts are designed to be Chief® is a registered trademark of Milestone AV Technologies. used ONLY with the following Epson projector models: All rights reserved. •...
Page 4
AN2BA Series Installation Instructions LEGEND Tighten Fastener Pencil Mark Apretar elemento de fijación Marcar con lápiz Befestigungsteil festziehen Stiftmarkierung Apertar fixador Marcar com lápis Serrare il fissaggio Segno a matita Bevestiging vastdraaien Potloodmerkteken Serrez les fixations Marquage au crayon Loosen Fastener Drill Hole Aflojar elemento de fijación...
AN2BA Series Installation Instructions INSTALLATION Determining Location 2 3/4” [70mm] 10 5/8” [270mm] HEIGHT FROM FLOOR FLOOR Figure 1 Table 1: Fastener Information Determine desired height of screen (measured from floor). (See Figure 1) Determine desired center of screen. (See Figure 1)
Page 7
Installation Instructions AN2BA Series Installing Wall Bracket Tighten fastener against wall bracket. (See Figure 3) Slide the tabs on the upper wall bracket (A) into the slots on Determine location of studs behind drywall, and mark a wall hanging bracket (B). (See Figure 2) minimum of two locations for wall bracket attachment over studs.
Page 8
AN2BA Series Installation Instructions Installing Boom Projector Mount Turn adjustment bolt to move projector mount towards end of boom arm, until front of adjustable plate lines up with IMPORTANT ! : The boom projector mount ships ready "100" marking on boom arm. (See Figure 5) to install for the AN2BA87.
Page 9
Notch in wall bracket assembly indicates center of screen. Remove and keep one fastener from bottom of sensor. NOTE: The sensor is included with the Epson projector, not the AN2BA Series mount. (W) x 2 Figure 8 Figure 9 Remove and keep sensor cover. (See Figure 8)
Page 10
AN2BA Series Installation Instructions Installing Projector Attach projector interface (T) to projector using four M4 x 12mm Phillips cap head screws (V). (See Figure 10) Slot (V) x 4 Latch UNLOCKED LOCKED Slot Figure 10 NOTE: Make sure projector mount is in UNLOCKED position and remove key from projector mount.(See Figure •)
Page 11
Installation Instructions AN2BA Series Align Projector Image Yaw Adjustment (Rotation) Using remote control included with projector: Adjust projector so that the top and bottom horizontal lines of the test pattern are parallel with each other and with top and Select MENU bottom of screen.
Page 12
AN2BA Series Installation Instructions Pitch Adjustment (Vertical Elevation) Adjust projector so that the top and bottom horizontal lines of the test pattern are parallel with each other and with top and bottom of screen. Loosen pitch adjustment locking screw using a #2 Phillips screwdriver.
Page 13
Installation Instructions AN2BA Series Installing Control Housing Align holes in control pad with bosses in control housing and push control pad into place. (See Figure 18) Open door on control panel assembly (EE). Secure control pad into place using two #4-24 x 1/4" Phillips Insert edges of control panel assembly (EE) into groove in pan head screws (DD).
Page 14
AN2BA Series Installation Instructions Adding Screen Brackets to Screen NOTE: Use 3 screen brackets (minimum of 2 brackets) along bottom of screen, and locate brackets as close to outer corners as possible. Remaining brackets may be used along sides of screen, as desired.
Page 15
Installation Instructions AN2BA Series Calibrating Finger Touch Unit (FTU) Snap calibration marker spacers (QQ) into bottom of calibration markers included with Epson projector. (See Figure 23) NOTE: Ensure that magnet on calibration marker spacer (QQ) lines up with target on calibration marker.
Page 16
AN2BA Series Installation Instructions FASTENER INSTALLATION METHODS Steel stud NOTE: Refer to Table 1 for appropriate hardware and pilot hole (if present) sizes for various wall types. Drywall Steel Stud / Drywall Plastic cap Hold metal channel on anchor (H) flat alongside plastic straps and slide channel through hole.
Page 17
Installation Instructions AN2BA Series Wood Stud NOTE: Refer to Table 1 for appropriate hardware and pilot hole sizes for various wall types. Use one 1/4 x 2-1/2" lag bolt (J) through product and into pilot hole. (See Figure 31) Repeat for remaining pilot hole.
Page 20
Europe A Franklinstraat 14, 6003 DK Weert, Netherlands P +31 (0) 495 580 852 F +31 (0) 495 580 845 Chief, a products division of Asia Pacific A Office No. 918 on 9/F, Shatin Galleria Milestone AV Technologies 18-24 Shan Mei Street...
Need help?
Do you have a question about the AN2BA Series and is the answer not in the manual?
Questions and answers