Download Print this page

CHIEF AN2BA Series Installation Instructions Manual

All-in-one system

Advertisement

Quick Links

I N S T A L L A T I O N I N S T R U C T I O N S
All-in-One System
Spanish Product Description
German Product Description
Portuguese Product Description
Italian Product Description
Dutch Product Description
French Product Description
AN2BA Series

Advertisement

loading
Need help?

Need help?

Do you have a question about the AN2BA Series and is the answer not in the manual?

Questions and answers

Summary of Contents for CHIEF AN2BA Series

  • Page 1 I N S T A L L A T I O N I N S T R U C T I O N S All-in-One System Spanish Product Description German Product Description Portuguese Product Description Italian Product Description Dutch Product Description French Product Description AN2BA Series...
  • Page 2: Important Safety Instructions

    IMPORTANT ! : The AN2BA Series includes the AN2BA87 and AN2BA100 mounts. These mounts are designed to be Chief® is a registered trademark of Milestone AV Technologies. used ONLY with the following Epson projector models: All rights reserved. •...
  • Page 3 Installation Instructions AN2BA Series DIMENSIONS AN2BA87 8X 3.25 82.55 DIMENSIONS: INCHES [MILLIMETERS] AN2BA100 DIMENSIONS: INCHES [MILLIMETERS]...
  • Page 4 AN2BA Series Installation Instructions LEGEND Tighten Fastener Pencil Mark Apretar elemento de fijación Marcar con lápiz Befestigungsteil festziehen Stiftmarkierung Apertar fixador Marcar com lápis Serrare il fissaggio Segno a matita Bevestiging vastdraaien Potloodmerkteken Serrez les fixations Marquage au crayon Loosen Fastener Drill Hole Aflojar elemento de fijación...
  • Page 5: Tools Required For Installation

    Installation Instructions AN2BA Series TOOLS REQUIRED FOR INSTALLATION #1, #2 3/8" 1/8" (wood) 7/16" 1/2" (drywall) 8mm (concrete) 3/8" 6mm (concrete - AF6 toggler) 7/16" PARTS D (1) 9200-003806 [Right valence bracket] C (1) [Left valence bracket] B (1) A (1)
  • Page 6: Installation

    AN2BA Series Installation Instructions INSTALLATION Determining Location 2 3/4” [70mm] 10 5/8” [270mm] HEIGHT FROM FLOOR FLOOR Figure 1 Table 1: Fastener Information Determine desired height of screen (measured from floor). (See Figure 1) Determine desired center of screen. (See Figure 1)
  • Page 7 Installation Instructions AN2BA Series Installing Wall Bracket Tighten fastener against wall bracket. (See Figure 3) Slide the tabs on the upper wall bracket (A) into the slots on Determine location of studs behind drywall, and mark a wall hanging bracket (B). (See Figure 2) minimum of two locations for wall bracket attachment over studs.
  • Page 8 AN2BA Series Installation Instructions Installing Boom Projector Mount Turn adjustment bolt to move projector mount towards end of boom arm, until front of adjustable plate lines up with IMPORTANT ! : The boom projector mount ships ready "100" marking on boom arm. (See Figure 5) to install for the AN2BA87.
  • Page 9 Notch in wall bracket assembly indicates center of screen. Remove and keep one fastener from bottom of sensor. NOTE: The sensor is included with the Epson projector, not the AN2BA Series mount. (W) x 2 Figure 8 Figure 9 Remove and keep sensor cover. (See Figure 8)
  • Page 10 AN2BA Series Installation Instructions Installing Projector Attach projector interface (T) to projector using four M4 x 12mm Phillips cap head screws (V). (See Figure 10) Slot (V) x 4 Latch UNLOCKED LOCKED Slot Figure 10 NOTE: Make sure projector mount is in UNLOCKED position and remove key from projector mount.(See Figure •)
  • Page 11 Installation Instructions AN2BA Series Align Projector Image Yaw Adjustment (Rotation) Using remote control included with projector: Adjust projector so that the top and bottom horizontal lines of the test pattern are parallel with each other and with top and Select MENU bottom of screen.
  • Page 12 AN2BA Series Installation Instructions Pitch Adjustment (Vertical Elevation) Adjust projector so that the top and bottom horizontal lines of the test pattern are parallel with each other and with top and bottom of screen. Loosen pitch adjustment locking screw using a #2 Phillips screwdriver.
  • Page 13 Installation Instructions AN2BA Series Installing Control Housing Align holes in control pad with bosses in control housing and push control pad into place. (See Figure 18) Open door on control panel assembly (EE). Secure control pad into place using two #4-24 x 1/4" Phillips Insert edges of control panel assembly (EE) into groove in pan head screws (DD).
  • Page 14 AN2BA Series Installation Instructions Adding Screen Brackets to Screen NOTE: Use 3 screen brackets (minimum of 2 brackets) along bottom of screen, and locate brackets as close to outer corners as possible. Remaining brackets may be used along sides of screen, as desired.
  • Page 15 Installation Instructions AN2BA Series Calibrating Finger Touch Unit (FTU) Snap calibration marker spacers (QQ) into bottom of calibration markers included with Epson projector. (See Figure 23) NOTE: Ensure that magnet on calibration marker spacer (QQ) lines up with target on calibration marker.
  • Page 16 AN2BA Series Installation Instructions FASTENER INSTALLATION METHODS Steel stud NOTE: Refer to Table 1 for appropriate hardware and pilot hole (if present) sizes for various wall types. Drywall Steel Stud / Drywall Plastic cap Hold metal channel on anchor (H) flat alongside plastic straps and slide channel through hole.
  • Page 17 Installation Instructions AN2BA Series Wood Stud NOTE: Refer to Table 1 for appropriate hardware and pilot hole sizes for various wall types. Use one 1/4 x 2-1/2" lag bolt (J) through product and into pilot hole. (See Figure 31) Repeat for remaining pilot hole.
  • Page 18 AN2BA Series Installation Instructions...
  • Page 19 Installation Instructions AN2BA Series...
  • Page 20 Europe A Franklinstraat 14, 6003 DK Weert, Netherlands P +31 (0) 495 580 852 F +31 (0) 495 580 845 Chief, a products division of Asia Pacific A Office No. 918 on 9/F, Shatin Galleria Milestone AV Technologies 18-24 Shan Mei Street...