Download Print this page
Glacier bay SCD-GBSH211 Installation Manual
Glacier bay SCD-GBSH211 Installation Manual

Glacier bay SCD-GBSH211 Installation Manual

Installation with a tile wall, base for corner shower 32.87x32.87x4.13”, 35.04x35.04x4.13”, 40.35x40.35x4.13”, 44.49x44.49x4.13”

Advertisement

Quick Links

32.87x32.87x4.13" SCD - GBSH211 / GBSH222
35.04x35.04x4.13" SCD - GBSH214 / GBSH224
40.35x40.35x4.13" SCD - GBSH217 / GBSH226
44.49x44.49x4.13" SCD - GBSH220 / GBSH228
BASE INSTALLATION MANUAL - FOR CORNER SHOWER
MANUEL D'INSTALLATION DE LA BASE - POUR DOUCHE EN COIN
MANUAL DE INSTALACIÓN DEL PLATO - PARA LA DUCHA EN MONEDA
INSTALLATION WITH A TILE WALL
START WITH THIS INSTALLATION MANUAL
1) FIRST, INSTALL YOUR SHOWER BASE (USING THIS MANUAL)
2) SECOND, INSTALL YOUR SHOWER ENCLOSURE.
INSTALLATION AVEC UN MUR EN TUILE
COMMENCER PAR CE MANUEL D'INSTALLATION
1) PREMIÈREMENT, INSTALLEZ VOTRE BASE DE DOUCHE (EN VOUS SERVANT DE CE MANUEL).
2) DEUXIÈMEMENT, INSTALLEZ VOTRE CABINE DE DOUCHE.
INSTALACIÓN CON UNA PARED DE AZULEJOS
COMIENCE CON ESTE MANUAL DE INSTALACIÓN
1) PRIMERO, INSTALE SU PLATO DE DUCHA (USANDO ESTE MANUAL).
2) SEGUNDO, INSTALE SU PUERTA DE DUCHA.
An installation video guide can be found on our Youtube channel:
Un guide d'installation vidéo est disponible sur notre chaîne Youtube:
Una guía de instalación de vídeo está disponible en nuestro canal de Youtube:
https://youtu.be/rvPKJxLK3BM
Questions, problems, need help?
Call our customer service department at
1-855-434-5224, 9 a.m. - 5 p.m., EST, Monday - Friday
Questions, problèmes ou besoin d'aide?
Contactez notre service à la clientèle au
1-855-434-5224, du lundi au vendredi de 9h00 à 17h00 HNE.
Preguntas, problemas o necesita ayuda?
Llame a nuestro departamento de servicio al cliente al
1-855-434-5224, 9 am. – 5 pm., HDE, Lunes a Viernes.
PAGE 1
2019-12-02
HOMEDEPOT.COM

Advertisement

loading
Need help?

Need help?

Do you have a question about the SCD-GBSH211 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Glacier bay SCD-GBSH211

  • Page 1 32.87x32.87x4.13” SCD - GBSH211 / GBSH222 35.04x35.04x4.13” SCD - GBSH214 / GBSH224 40.35x40.35x4.13” SCD - GBSH217 / GBSH226 44.49x44.49x4.13” SCD - GBSH220 / GBSH228 BASE INSTALLATION MANUAL - FOR CORNER SHOWER MANUEL D’INSTALLATION DE LA BASE - POUR DOUCHE EN COIN MANUAL DE INSTALACIÓN DEL PLATO - PARA LA DUCHA EN MONEDA INSTALLATION WITH A TILE WALL START WITH THIS INSTALLATION MANUAL...
  • Page 2 BASE INSTALLATION INSTALLATION DE LA BASE INSTALACIÓN DEL PLATO 32” 34” 36” 38” 32" 34 1/16" 36" 38" 813mm 865mm 915mm 965mm 5 1/8" 5 1/8" 5 1/8" 5 1/8" 130mm 130mm 130mm 130mm 4 1/8" 4 1/8" 4 1/8" 4 1/8"...
  • Page 3 SAFETY INFORMATION INFORMATION SUR LA SÉCURITÉ INFORMACIÓN DE SEGURIDAD CAUTION Please carefully read the following important safety information before handling or installing this shower. There is a risk of serious injury while handling this product. To minimize these risks, please note: •...
  • Page 4 SAFETY NOTICE AVIS DE SÉCURITÉ AVISOS DE SEGURIDAD NOTICE • Any modification or alteration from what is specified in this instruction manual will void any and all warranty on this product. • The distributor is not responsible for any damage to the unit or personal property caused by improper installation. If you disregard instructional warnings, you will void your warranty and possibly deal with water damage.
  • Page 5 PART LIST LISTE DES PIÈCES LISTA DE PIEZAS PART # DESCRIPTION QUANTITY CODE # DE PIÈCE DESCRIPTION QUANTITÉ CODE PARTE # DESCRIPCIÓN CANTIDAD CÓDIO Shower base Base de douche Plato de ducha Screw (ST4x16mm) Vis (ST4x16mm) Tornillo (ST4x16mm) TOOLS REQUIRED (not supplied) OUTILS REQUIS (non fournis) HERRAMIENTAS NECESARIAS (no incluido) Pencil...
  • Page 6 BASE INSTALLATION: OVERVIEW INSTALLATION DE LA BASE: UN APERÇU INSTALACIÓN DEL PLATO: VISIÓN GENERAL A. Before you start the installation of your shower base, consult the illustration A below showing a side-view of the completed installation. B. Illustration B shows the recommended wall structure and measurements for the shower base installation. NOTE: Customer must follow and comply with the local and national building and plumbing code.
  • Page 7 BASE INSTALLATION INSTALLATION DE LA BASE INSTALACIÓN DEL PLATO A. Ensure that the wall structure is leveled. B. Place the shower base (A) on the floor and mark the outline using a pencil. A. Assurez-vous que la structure du mur soit nivelée. B.
  • Page 8 BASE INSTALLATION: SHOWER DRAIN GUIDELINES INSTALLATION DE LA BASE: DRAIN DE DOUCHE INSTALACIÓN DEL PLATO: DESAGÜE DE LA DUCHA A. Ensure that the waste pipe plumbing is completed. B. The shower drain is not supplied, these illustrations are for reference only. It is recommended that you review the drain installation from the manufacturer before continuing.
  • Page 9 BASE INSTALLATION INSTALLATION DE LA BASE INSTALACIÓN DEL PLATO A. Apply cement (1” to 1 1/2” [25 to 38mm] thick) within the traced contour of the shower base. This will help level the base in subsequent steps. The thickness of the cement layer varies depending on your floor. B.
  • Page 10 BASE INSTALLATION INSTALLATION DE LA BASE INSTALACIÓN DEL PLATO A. The shower base flange is slightly slopped by design. At the locations where you will screw the shower base to the studs, it is recommended that you use wood shims to fill the gap between the base flange and the drywall. B-C.
  • Page 11 BASE INSTALLATION INSTALLATION DE LA BASE INSTALACIÓN DEL PLATO A. Cut the protruding part of the wood shims. B. Let the cement dry for 24h before continuing. A. Coupez la partie saillante des cales de bois. B. Laissez le ciment sécher pendant 24h avant de continuer. A.
  • Page 12 BASE INSTALLATION: DRYWALLS INSTALLATION DE LA BASE: MURS DE PLACOPLÂTRE INSTALACIÓN DEL PLATO: PANELES DE YESO A. Ensure that the wall structure is leveled. Measure the location of the existing shower plumbing, as exemplified by the measures W1, W2, W3 and W4 below.
  • Page 13 BASE INSTALLATION: DRYWALLS INSTALLATION DE LA BASE: MURS DE PLACOPLÂTRE INSTALACIÓN DEL PLATO: PANELES DE YESO A-B. Fix the drywalls to the studs using drywall screws. Follow the applicable building code requirements. C. Note that the drywalls have to rest on top of the shower base flange. A-B.
  • Page 14 BASE INSTALLATION INSTALLATION DE LA BASE INSTALACIÓN DEL PLATO A. Install the tiles on your wall. B. Seal all joints with silicone. A. Posez les carreaux sur votre mur. B. Scellez tous les joints avec du silicone. A. Instale los azulejos en su pared. B.