ICA SIN1100C User Manual page 12

Uninterruptible power systems
Hide thumbs Also See for SIN1100C:
Table of Contents

Advertisement

V. UPS INSTALLATION / PEMASANGAN UPS
1. High voltage DC at external battery terminal, although all the circuit breaker "OFF"
don't touch this terminal battery.
2. Because there is a high voltage, installation must be done by technician.
3. Make sure circuit breaker at "OFF" position before wiring installation.
4. Cause of current needed higher than wall outlet capacity, do not connect directly the
input cable to wall outlet.
5. Only use match cable size for the MCCB.
1. Tegangan tinggi DC ada pada terminal blok baterai luar, walaupun semua circuit
breaker dalam keadaan "OFF" jangan sentuh terminal blok baterai ini.
2. Dikarenakan ada tegangan tinggi, pemasangan harus dikerjakan oleh teknisi.
3. Pastikan circuit breaker dalam keadaan "OFF" sebelum pemasangan kabel - kabel.
4. Karena diperlukan arus listrik yang lebih besar dari kemampuan outlet pada dinding,
jangan hubungkan secara langsung kabel input dengan outlet tersebut.
5. Gunakan pengaman MCCB dan kabel dengan ukuran yang sesuai.
Figure 4-2. UPS Customer Wiring
POWER SOURCE
MCCB-A
HOT
LINE
NEUTRAL
NEUTRAL
EARTH
GROUND
MCCB-B
POSITIVE
NEGATIVE
POWER SOURCE
MCCB-A
HOT
LINE
NEUTRAL
NEUTRAL
EARTH
GROUND
MCCB-B
POSITIVE
NEGATIVE
MCCB1
BATTERY
CONNECTOR
MCCB1
UPS SIN2100C
MCCB2
MCCB2
MCCB1
BATTERY
CONNECTOR
MCCB1
UPS SIN3100C
10
LINE
NEUTRAL
GROUND
LINE
NEUTRAL
GROUND

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sin1500cSin2100cSin3100c

Table of Contents