AirPlus DM-6000 Installation, Operation And Maintenance Manual

Advertisement

INSTALLATION, OPERATION,
AND MAINTENANCE MANUAL
DM-6000

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DM-6000 and is the answer not in the manual?

Questions and answers

Summary of Contents for AirPlus DM-6000

  • Page 1 INSTALLATION, OPERATION, AND MAINTENANCE MANUAL DM-6000...
  • Page 2 24 hours of operation and upon start-up. The DM-6000 can be installed in the supply duct of any air handling system. The goal of the technology is to introduce ions to the airflow and have them delivered to the occupied space, so mount the DM-6000 as close to the supply diffusers as possible.
  • Page 3 CAUTION: Do not power the ionizer from the same circuit or transformer to a UV Lamp. Ideally, a dedicated 24V AC transformer be used to power the DM-6000. If this is not possi- ble, power from a transformer serving other equipment may be used if sized adequately to handle the additional VA rating of the DM-6000.
  • Page 4 24 hours and upon start-up. TROUBLESHOOTING If the DM-6000 is not operating, check that the power switch is set to the “On” position and the Ionization LED is illuminated. Confirm that all power wiring is connected properly to the terminal block on the outside of the unit.